My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/08/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
12/08/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:30:23 AM
Creation date
12/3/2021 3:54:10 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/08/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />0 <br />0 <br />U' <br />z <br />W <br />CO <br />W <br />0 <br />a <br />00 <br />00 <br />LO <br />CD <br />0 <br />N <br />W <br />D <br />W <br />W <br />W <br />af <br />F- <br />W <br />M <br />W <br />00 <br />wsb <br />Memorandum <br />To: Katie Larsen, City Planner, City of Lino Lakes <br />From: Diane Hankee, City Engineer, City of Lino Lakes <br />Date: December 1, 2021 <br />Re: MTO Properties — Thrivent Financial <br />Final Plat & Plan Review <br />019406-000 <br />WSB has reviewed the Final Plat and Civil Plans for the MTO Properties — Thrivent Financial site <br />plan in Lino Lakes, MN, prepared by Plowe Engineering, E.G. Rud & Sons, Inc. and Progressive <br />Architecture received on November 12, 2021. The following are our review comments that <br />should be responded to in writing by the applicant. These comments are based on review of the <br />following plan sets and documents: <br />DO MTO Properties Addition Plat prepared by E.G. Rud & Sons, Inc. dated November 11, <br />2021 <br />00 MTO Properties Addition Civil and Landscape plans prepared by Plowe Engineering, Inc., <br />dated November 11, 2021 <br />oo Thrivent MTO Properties Architectural & Site Plan Review plans prepared by Progressive <br />Architecture, dated November 12, 2021 <br />00 Draft Soil Borings Logs prepared by Haugo Geotechnical Services, dated November 5, <br />2021 <br />00 Site Drainage Narrative and Calculations dated November 5, 2021 and revised <br />November 19, 2021 <br />Engineering <br />• Grading <br />The MTO Properties Addition plans include site grading for the proposed building, parking <br />lot, and the stormwater pond. <br />Comments: <br />1. Applicant to show existing contours 100-ft beyond the site. <br />2. Applicant to update gaps in existing contours that can be seen on sheet C1.2 <br />(i.e. 884 — 890 contours north of the site by the wetland, 888 and 890 contours <br />southeast of site). <br />• Stormwater Management <br />Most of the stormwater on the site flows to an existing wetland northwest of the site. The <br />rest of the stormwater on the site flows to the south to Blue Heron Drive. The stormwater <br />from the site ultimately flows to Rice Lake. <br />
The URL can be used to link to this page
Your browser does not support the video tag.