My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/08/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
12/08/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:30:23 AM
Creation date
12/3/2021 3:54:10 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/08/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 FIRST FLR PLAN <br />1 /4„ = 1'-011 <br />GENERAL NOTES <br />1. VERIFY CONDITIONS NOTED AS EXIST. AND NOTIFY ARCHITECT IMMEDIATELY OF ANY <br />DISCREPANCIES. <br />2. PATCH EXIST SURFACES DAMAGED OR ALTERED BY THIS WORK WITH MATERIALS TO <br />MATCH EXIST ADJACENT SURFACES. COORDINATE ELECTRICAL, MECHANICAL AND <br />PLUMBING REQUIREMENTS AS REQUIRED. COORDINATE WITH LOW VOLTAGE SUPPLIERS, <br />ON LOCATION OF TELEVISIONS, COMPUTERS AND WIRELESS CHARGING STATIONS. <br />PROVIDE BACKING WHERE REQ'D TO SUPPORT WALL MOUNTED EQUIPMENT. <br />3. ALL DIMENSIONS PROVIDED ARE FROM FACE OF STUD TO FACE OF STUD, SHEATHING <br />OR OTHER STRUCTURAL ELEMENT, UON. <br />4. DIMENSIONS PROVIDED FROM EXISTING BUILDING COMPONENTS ARE FROM FACE OF <br />FINISH, UNLESS OTHERWISE NOTED. <br />5. INTERIOR FINISHES ARE TYP. LVT FOR PRIMARY TRAVEL AREAS, OFFICES AND CONE. RM. <br />ARE TO BE MODULAR CARPETING. ALL RESTROOMS TO HAVE FLOOR AND WALL TILE TO <br />46" AFF ON ALL WALLS. <br />G. METAL TRIMMED OPEN GLAZED TEMP GLASS DIVIDERS ARE SHOWN AT THIS TIME. <br />UTILIZE TRANSWALL OR DIRTT WALL SYSTEM OR SIMILAR. GC TO INVESTIGATE OPTIONS. <br />7. ALL INTERIOR AND EXTERIOR FINISHES TO BE FINALIZED BY ARCHITECT $ CLIENT PRIOR <br />TO PROCEEDING. IMAGES ARE SHOWN FOR REFERENCE AT THIS TIME. <br />9. ITEMS NOT SHOWN BUT TO BE FINALIZED BY CLIENT AND GC INCLUDE BUT NOT LIMITED <br />TO: LOW VOLTAGE, SECURITY, WINDOW TREATMENTS, PA OR MUSIC SYSTEM, FINAL <br />RCP PLAN AND GENERAL INTERIOR * EXTERIOR LIGHTING. SOME ACCENT / DECORATIVE <br />INTERIOR LIGHTING TO BE INCLUDED A5 WELL. <br />ROOM SCHEDULE <br />NUMBED NAME ARE <br />59 CIRCULATION 272.3 SF <br />100 <br />VESTIBULE <br />G7.7 51' <br />101 <br />RECEPTION <br />325.4 SF <br />102 <br />CONF2 <br />1 13.4 5F <br />103 <br />RE5TRM 1 <br />75.9 SF <br />104 <br />WORK5T. (2x) <br />153.3 SF <br />105 <br />COPY/STO <br />74.4 SF <br />I OG <br />MECH <br />G3.0 SF <br />107 <br />OFFICE 3 <br />12 1.1 51' <br />108 <br />OFFICE 4 <br />123.4 SF <br />109 <br />OFFICE 5 <br />1 17.7 SF <br />1 10 <br />BREAK ROOM <br />475.0 SF <br />1 1 1 <br />STORAGE <br />40.G SF <br />1 12 <br />RE5TRM2 <br />87.3 51' <br />1 13 <br />OFFICE 2 <br />99.8 SF <br />1 14 <br />OFFICE 1 <br />95.9 51' <br />1 15 <br />CONE 1 <br />154.2 SF <br />TOTAL SQUARE FOOTAGE FOR BUILDING (INCLUDING VESTIBULE) IS 2,873. <br />NOTE: <br />BUILDING TO BE SPRINKLED WITH NO ATTIC SPACE. <br />"mJ <br />NORTH <br />SK <br />CC <br />RE <br />NC <br />11/10/2021 4:38:08 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.