My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/08/2021 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2021
>
12/08/2021 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 10:30:23 AM
Creation date
12/3/2021 3:54:10 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/08/2021
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. The entire area other than occupied by buildings or structures or planting shall be <br />surfaced with bituminous or concrete which will control dust and drainage. The <br />entire area shall have a perimeter curb barrier, a storm water drainage system and is <br />subject to the approval of the City Engineer. <br />The PTAC development will be surfaced with bituminous material, and the entire area <br />will have a perimeter curb barrier. The City Engineer has reviewed the storm water <br />drainage system and notes that some revisions will be required. <br />3. All buildings shall provide an interior location for trash handling or an enclosed trash <br />receptacle area in conformance with the following: <br />a. Exterior wall treatment shall be similar and/or complement the principal <br />building. <br />b. The enclosed trash receptacle area shall be located in the rear or in a side yard <br />which is not abutting a street. <br />c. The trash enclosure must be in an accessible location for pick up hauling <br />vehicles. <br />d. The trash enclosure must be fully screened from view of adjacent properties. <br />The PTAC development plans indicate a fully enclosed trash receptacle area at the rear <br />of the property that will be of similar color and material to the main building. <br />4. All painting must be conducted in an approved paint booth. All paint booths and all <br />other activities of the operation shall thoroughly control the emission of fumes, dust <br />or other particulated matter so that the use shall be in compliance with the State of <br />Minnesota Pollution Control Standards, Minnesota Regulation APC 1-15, as <br />amended. <br />The PTAC development shall meet these requirements. <br />5. The emission of odor by a use shall be in compliance with and regulated by the State <br />of Minnesota Pollution Control Standards, Minnesota regulations APC, as amended. <br />The project will not generate excessive smoke, fumes or odors. <br />6. All flammable materials, including liquids and rags, shall conform with the applicable <br />provisions of the Minnesota Uniform Fire Code. <br />The PTAC development shall meet these requirements. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.