My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-13-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
12-13-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2024 3:10:26 PM
Creation date
12/14/2021 12:40:39 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/13/2021
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />CITY COUNCIL <br />AGENDA ITEM 1L <br /> <br />STAFF ORIGINATOR: Rick DeGardner, Public Services Director <br /> <br />MEETING DATE: December 13, 2021 <br /> <br />TOPIC: Consider Approval of Rookery Activity Center Expenditures <br /> <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />BACKGROUND <br />Staff is recommending approval of the following expenditures for the Rookery Activity Center: <br /> <br />Touchless plumbing fixtures - Recommend approving a contract with NAC in the amount of <br />$12,750.00 to furnish labor and materials for hands free plumbing fixtures throughout the <br />Rookery including: <br /> Demo (22) existing manual flush valves <br /> Demo (13) top mounted 4” base faucets <br /> Mount (22) new battery operated automatic flush valves <br /> Mount (17) 4” base battery operated deck mounted automatic faucet <br /> Mount and install control box for each faucet <br /> Install mixing valve and set to customer desired temperature <br /> Install water connections to the faucet and control box <br /> Run power wiring between the faucet and the controls <br /> Startup and verify operation <br />Paint metal railings and door frames on mezzanine level - Recommend approving a contract with <br />Edina Painting Company in the amount of $3,900.00 to furnish labor and materials for two coats <br />of paint for the metal railings and prep/paint the metal door frames. <br /> <br />Electronic door access - Recommend approving a contract with Electro Watchman, Inc. in the <br />amount of $13,129.07 to install card readers for the main doors and administrative offices area. <br />This is the same system currently in operation at all City buildings. <br /> <br />Paint Natatorium and Locker Rooms – Scope of project not to exceed $65,000.00. Consists of <br />painting entire pool area and the three locker rooms including: <br /> Apply two coats of Epoxy coating to the walls in the pool area including the two <br />offices, and the three locker rooms. <br /> Clean ceiling in pool area as needed. <br /> Apply paint to the ceiling areas and the blue ductwork. <br /> Apply two coats of Procustic paint to the sound panels. <br /> Includes all materials <br /> Includes lift
The URL can be used to link to this page
Your browser does not support the video tag.