Laserfiche WebLink
4. Conditions attached to approval of the preliminary plat have been fulfilled or <br />secured by the Development Agreement. <br />5. All fees, charges and escrow related to the preliminary or final plat have been paid <br />in full. <br />BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby <br />approves MTO Properties Addition Final Plat subject to the following conditions: <br />1. A conservation easement and wetland buffer declaration shall be recorded over <br />the wetland and buffer. <br />2. A Development Agreement and securities related to the final plat and commercial <br />building are required. <br />3. A Declaration for Maintenance of Stormwater Facilities related to the private <br />stormwater management facilities is required. <br />4. Separate sign permit applications are required for all permanent monument/pylon <br />and wall signage. <br />5. Separate sign permit applications are required for all temporary signage. <br />BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby <br />approves MTO Properties Addition Final Plat subject to the following items being <br />addressed prior to release of the mylars: <br />1. All comments from the City Engineer letter dated December 1, 2021 shall be <br />addressed. <br />2. All comments from the Environmental Coordinator Memo dated November 30, <br />2021 shall be addressed. <br />3. All comments from the Anoka County Highway Department dated December 21, <br />2021 shall be addressed. <br />4. The applicant shall draft a Declaration for Maintenance of Stormwater Facilities <br />for the private stormwater maintenance facility. <br />5. A conservation easement and wetland buffer declaration shall be drafted for City <br />review and comment. <br />a. The documents shall include both RCWD and the City of Lino Lakes as <br />parties. <br />6. The Site Drainage Narrative and Calculations Report shall include the name of <br />company and professional engineer that wrote it. <br />7. All applicable plan sheets: <br />a. Plan sheets note a 1 Oft wide trail on the southeast corner of the site. <br />Please confirm if this is actually a trail. If it is not, please remove the <br />comment from all sheets. <br />8. Sheet TO, Title Page: <br />a. The 1Oft wide trail shall be shown as a removal if it actually exists. <br />9. Final Plat <br />a. A drainage & utility easement is required 1 Oft beyond the stormwater <br />management facility's 100-year storm high water level elevation. <br />b. The drainage & utility easement shall be at least 1 Oft beyond the <br />delineated wetland boundary. <br />