Laserfiche WebLink
MTO Properties Addition <br />Development Agreement <br />January 10, 2022 <br />Developer shall provide a contract with a qualified firm for the establishment <br />and maintenance of all open space / native plant areas. Said contract shall cover <br />a minimum of the 3 year establishment period, from the date of planting. <br />j. The Developer shall arrange for all gas, telecommunications, cable, internet, <br />electric, and other necessary private utility services to the Subdivision in <br />accordance with City Code and State law. The Developer is solely responsible for <br />the cost of private utility and internet installation. <br />k. The Developer shall install mailboxes in accordance with Federal and Postal <br />Service regulations. <br />The Developer shall install conservation easement signs per City standard detail <br />plates prior to the issuance of building permits. <br />5. Time of Performance. The Developer shall install all required improvements <br />enumerated in Paragraph 6 by November 30, 2022. The Developer may request a <br />reasonable extension of time from the City. If the extension is granted, it shall be <br />conditioned upon updating the security posted by the Developer to reflect cost <br />increases and the extended completion date. <br />6. City Improvements. No City installed improvements are proposed to be constructed for <br />this subdivision. <br />7. Record Drawings. <br />Upon project completion, Developer shall submit record drawings, in electronic <br />format, of all public and private infrastructure improvements, including grading, <br />sanitary sewer, watermain, and storm sewer facilities, constructed by Developer. <br />The files shall be drawn in Anoka County NAD 83 Coordinate system and provided <br />in both AutoCAD .dwg and Adobe .pdf file formats. The plans shall include accurate <br />locations, dimensions, elevations, grades, slopes and all other pertinent <br />information concerning the complete work. <br />b. The Developer shall submit certified compaction testing results for the site <br />grading operations that certify that grading work meets pertinent compaction <br />requirements for the project. <br />c. A summary of the record plan attribute data for the storm sewer, watermain, <br />and sanitary sewer structures and pipes shall be submitted in the form of an <br />Excel Spreadsheet as provided by the City Engineer. <br />d. No securities will be fully released until all record drawings have been submitted <br />and accepted by the City Engineer. <br />page 4 <br />