My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-011 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-011 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 7:20:15 PM
Creation date
1/14/2022 11:24:10 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
01/10/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br /> AGENDA ITEM 5A <br /> STAFF ORIGINATOR: Diane Hankee,PE City Engineer <br /> C. C. MEETING DATE: January 10, 2022 <br /> TOPIC: Consider Resolution 22-11, Order Project,Approve the Plans <br /> and Specifications and Authorize the Ad for Bid, Water Tower <br /> No. 2 Reconditioning Project <br /> VOTE REQUIRED: 3/5 <br /> INTRODUCTION <br /> Staff is requesting Council approval to authorize the ad for bid for the Water Tower No. 2 <br /> Reconditioning Project. <br /> BACKGROUND <br /> On October 25,2021,the City Council approved the preparation of the plans and specifications for <br /> the Water Tower No. 2 Reconditioning Project located at 7001 Otter Lake Road. This tower was <br /> constructed in 1996. The water tower inspection report identified several structural and coating <br /> issues that need to be addressed. In addition,the exterior and interior dry coatings are over 24 <br /> years old and have surpassed their life expectancy. Coatings on water towers are typically <br /> replaced every 20 years, or more frequently to protect the underlying steel surfaces from <br /> corrosion. <br /> This is a 14-16 week project commencing with the coordination of all wireless carrier antennae <br /> being removed from the water tower and relocated to a temporary structure. The tower is then <br /> curtained off, sand blasted, repairs made as needed,then re-coated inside and out. We are <br /> hoping that this project will be completed by early summer to avoid any disruption to our water <br /> supply. <br /> The estimated construction cost is $1,536,000. Funding for the project is through the Water <br /> Operating Fund. <br /> The schedule for this project is as follows: <br /> Authorize Preparation of Plans and Specifications October 25,2021 <br /> Order Improvement,Approve Plans and Specs,Authorize Ad for Bids January 10,2022 <br /> City Opens Bids February 8,2022 <br /> City Council Awards Contract February 14,2022 <br /> Construction Begins May,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.