My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-27-2021 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2021
>
Searchable Packets
>
12-27-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2024 3:10:27 PM
Creation date
1/20/2022 4:24:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/27/2021
Council Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL WORK SESSION <br />DRAFT <br /> 2 <br />under the agreement. The homes would not receive occupancy permits until they meet all 45 <br />requirements. 46 <br /> 47 <br />Item 6C) Resolution No. 21-154, Plans and Specifications for 2022 East Shadow 48 <br />Lake Drive Utility Project – City Engineer Hankee explained the project location. Staff 49 <br />has identified through televising that there is a sagging line and some settlement in utility 50 <br />lines. It could lead to back-ups if not repaired. Excavation will result in the need to 51 <br />repair curbs and gutters. Mayor Rafferty asked about the diagonal water pipe in the road; 52 <br />staff explained that the diagonal is a storm sewer line and is not involved in this project. 53 <br /> 54 <br />Item 6D, Resolution No. 21-155, Payment for 2020 Surface Water Maintenance 55 <br />Project – City Engineer Hankee reported that there were two contracts for this year’s 56 <br />project; one has been fully paid. This request would finalize the second contract with 57 <br />Olson; their work is finished. Councilmember Stoesz noted that the percentage complete 58 <br />noted in the report is over 100 percent. Ms. Hankee explained that additional work was 59 <br />performed. 60 <br /> 61 <br />Item 6E, Resolution No. 21-156, Plans and Specifications for the 2022 I-35E Pipe 62 <br />Crossing Project – City Engineer Hankee noted the east side drainage project and the 63 <br />need to pipe under the freeway as well as add adjacent ponding. The project is funded 64 <br />through the Surface Water Management Fund. Councilmember Stoesz suggested keeping 65 <br />NorthMetro TV informed on the project; it could be an interesting project to the 66 <br />community. 67 <br /> 68 <br />Item 6F, Resolution No. 21-157, Project, Plans and Specifications, Ad for Bid, 2022 69 <br />Street Rehabilitation Project- City Engineer Hankee reviewed areas that would be 70 <br />included in the 2022 project. Staff will attempt to bid the project at the most opportune 71 <br />time (for best price). 72 <br /> 73 <br />Item 6G, Resolution No. 21-158, Economic Development Strategic Plan – Community 74 <br />Development Director Grochala recalled that this plan was presented and discussed at the 75 <br />work session. Councilmember Cavegn asked when staff would assign dates; Mr. 76 <br />Grochala said staff will be updating items as certain actions are taken; there will probably 77 <br />be check-in points for some items, rather than dates. 78 <br /> 79 <br />Mayor Rafferty suggested that the council remain informed on the larger projects such as 80 <br />water towers and wells. Perhaps as weather allows, the council can view some of the 81 <br />work in person. 82 <br /> 83 <br />The meeting was adjourned at 6:25 p.m. 84 <br /> 85 <br />These minutes were considered, corrected and approved at the regular Council meeting held on 86 <br />December 27, 2021. 87 <br /> 88 <br /> 89
The URL can be used to link to this page
Your browser does not support the video tag.