Laserfiche WebLink
wsb <br />Memorandum <br />To: Katie Larsen, City Planner, City of Lino Lakes <br />From: Diane Hankee, City Engineer, City of Lino Lakes <br />Date: January 14, 2022 <br />Re: Natures Refuge Final Plat Submittal Review - M/I Homes <br />WSB has reviewed the Natures Refuge Final Plat Submittal from M/I Homes Minneapolis/St Paul <br />submitted on December 22, 2021: <br />• Sanitary Sewer, Watermain, Storm Sewer, and Street Construction Plans <br />• Grading, Development, and Erosion Control Plans <br />• Final Plat <br />Engineering <br />The Natures Refuge original review comments can be found in the engineering letter dated July 22, <br />2020 and have been addressed. <br />• Stormwater Management <br />There is no known change to the proposed stormwater management plan. RCWD will need amend <br />their permit for the changed ownership of outlots. <br />• Water Supply <br />The applicant should reference the City of Lino Lakes 2022 Specifications on the cover page or <br />layout page. Note that anode bags are required. <br />• Sanitary Sewer <br />The applicant should reference the City of Lino Lakes 2022 Specifications on the cover page or <br />layout page. Note that curb box specs have been update to include a tracer wire connection. <br />The existing sewer line on Main St flow arrows should be reversed. <br />• Transportation <br />The applicant shall provide notice to property owners impacted by the turn construction prior to <br />construction. T2 grading existing wetland should be screened so that contours are shown. <br />• Wetlands <br />No further comments. <br />• Landscaping <br />The applicant shall note the City of Lino Lakes 2022 Specifications for native plant <br />establishment and 3 year maintenance requirements. The seed mix for the infiltration basins <br />should be identified on the landscape plan in addition to referencing to the wetland <br />