My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-24-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
01-24-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:30:21 PM
Creation date
1/21/2022 2:17:18 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/24/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natures Refuge <br />Development Agreement <br />January 24, 2022 <br />The trunk charge shall be paid at the time of subdivision approval or at the time of <br />hook-up, whichever is first. Residential trunk charges are based on one unit per <br />dwelling unit. Commercial/Industrial/Institutional (CII) trunk charges are based on <br />a factor of 2.92 units per acre. <br />Sa n ita ry Sewe r $1,630.00 Per Unit <br />Availability Charge <br />For residential properties, the availability charge shall be paid at the time of <br />subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the time <br />of building permit. Fees are based on the number of sanitary access charge <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES). <br />Residential uses shall be assigned one unit per dwelling unit unless otherwise <br />noted by MCES. <br />City Sewer (CSAC) $1,525.00 Per SAC Unit <br />Trunk sewer unit charges addressed under this paragraph are in addition to any <br />SAC charges imposed by Metropolitan Council Environmental Services. An <br />estimate of the total charge and the trunk utility credit for developer installed <br />trunk oversizing is specified in Exhibit C. <br />f. Trunk Water Connection Fees <br />The City established trunk utility connection fees to uniformly distribute the <br />costs of public trunk water infrastructure. The Trunk Utility Connection Fee <br />consists of two components; a Trunk Charge and an Availability Charge. <br />Trunk Charge <br />The trunk charge shall be paid at the time of subdivision approval or at the time of <br />hook-up, whichever is first. Residential trunk charges are based on one unit per <br />dwelling unit. Commercial/Industrial/Institutional (CII) trunk charges are based on <br />a factor of 2.92 units per acre. <br />Water <br />Availability Charge <br />page 8 <br />$2,341.00 Per Unit <br />
The URL can be used to link to this page
Your browser does not support the video tag.