My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-024 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-024 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 7:29:08 PM
Creation date
2/18/2022 9:21:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
02/14/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br /> AGENDA ITEM 5A <br /> STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br /> MEETING DATE: February 14, 2022 <br /> TOPIC: Consider Resolution No. 22-24,Accepting bids,Awarding a <br /> Construction Contract, Water Tower No. 2 Rehabilitation Project <br /> VOTE REQUIRED: 3/5 <br /> INTRODUCTION <br /> Staff is requesting council's consideration to accept bids and award a construction contract for <br /> the Water Tower No. 2 Rehabilitation Project. <br /> BACKGROUND <br /> On January 10,2022,the City Council ordered the project and authorized the ad for bid for the <br /> Water Tower No. 2 Rehabilitation Project located at 7001 Otter Lake Road. This tower was <br /> constructed in 1996. The water tower inspection report identified several structural and coating <br /> issues that need to be addressed. In addition,the exterior and interior dry coatings are over 24 <br /> years old and have surpassed their life expectancy. Coatings on water towers are typically <br /> replaced every 20 years, or more frequently to protect the underlying steel surfaces from <br /> corrosion. <br /> This is a 14-16 week project. The tower will be taken out service for a period of time while they <br /> work on the inside of the bowl. The completion date for this project is fall of 2022. <br /> Bids were received on Tuesday, February 8, 2022. A total of 3 bids were received and are <br /> summarized below: <br /> CONTRACTOR TOTAL BASE <br /> BID <br /> Classic Protective Coatings, Inc $1,188,857.80 <br /> Viking Industrial Painting $1,428,600.00 <br /> TMI Coatings, Inc. $1,637,000.00 <br /> The low bid was submitted by Classic Protective Coatings, Inc. in the amount of <br /> $1,188,857.00. The engineer's estimate was $1,536,000. Funding for the project is through the <br /> Water Operating Fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.