Laserfiche WebLink
A Proposal for Lake Amelia Subwatershed Management Plan for the City of Lino Lakes | 5 <br />LUKE LUNDE, CPSS, PSS, PSC <br />QA/QC <br />Luke is a Minnesota Professional Soil Scientist <br />and has twenty years of natural resource <br />and environmental review experience. Luke’s experience <br />includes soil survey mapping, wetland delineation, wetland <br />banking, wetland mitigation, habitat restoration, invasive <br />species management, grant writing, habitat restoration, <br />invasive species management, natural resource planning, <br />and environmental permitting and compliance for many <br />projects throughout the Midwest. He is very knowledgeable <br />in stream survey assessment, stream habitat restoration <br />design, floodplain restoration, vegetation management, <br />habitat conservation/ improvement, forest management, <br />precision conservation and water resources planning. <br />KENDRA FALLON, PE, CFM <br />WATER QUALITY MODELING <br />Kendra is a Project Engineer with over <br />four years of water resources engineering <br />experience. Kendra has experience with hydrologic and <br />hydraulic modeling and water quality modeling, pond <br />restoration, storm sewer design, writing local watershed <br />management plans, interpreting and reviewing for City <br />Thank you for the opportunity to propose on this project. Please do not hesitate to contact me at 612.246.9346 or <br />thavranek@wsbeng.com if you have any questions or comments. <br /> <br />Tony Havranek <br />Director of Fisheries/Principal <br />SCHEDULE <br />TASK SCHEDULED COMPLETION <br />1. KICK-OFF MEETING MARCH 15, 2022 <br />2. EXISTING CONDITIONS REVIEW APRIL 1, 2022 <br />3. WATER QUALITY AND DRAINAGE MODELING APRIL 29, 2022 <br />4. OWNERSHIP PHASING MAY 13, 2022 <br />5. SURFACE WATER IMPROVEMENT OPTIONS APRIL 29, 2022 <br />6. POLLUTANT LOAD REDUCTION AND COST ESTIMATE MAY 13, 2022 <br />7. PERMITTING AND FUNDING JUNE 17, 2022 <br />8. FINAL REPORT JULY 1, 2022 <br />stormwater requirements, and writing state and local <br />agency permit applications. She has experience working <br />with a variety of software including HydroCAD, GIS, P8, <br />XPSWMM, Civil 3D and all Microsoft Office programs to <br />help meet and exceed clients’ expectations. <br />ROXY ROBERTSON <br />SENIOR ENVIRONMENTAL SPECIALIST <br />Roxy is educated with a master’s degree in <br />ecology and is a Certified Associate Ecologist <br />with over nine years of experience. Roxy is proficient in <br />water resources permitting, wetland delineation, and habitat <br />restoration. She has completed DNR River Health and <br />Restoration training workshops, including stream survey <br />training and stream design. Her permitting experience <br />includes Wetland Conservation Act Decisions, Army Corps <br />of Engineer’s Section 404 and Section 10 Permits including <br />individual permits, Department of Natural Resources (DNR) <br />Public Waters Work Permit, DNR Utility Crossing Licenses, <br />Section 401 CWA individual certification, the National <br />Pollutant Discharge Elimination System Construction <br />Stormwater Permit, and Watershed District Permits. She <br />also has experience in construction observation, wetland <br />monitoring, habitat restoration design, and avian studies. <br />The cost to complete Tasks 1-8 is not to exceed $27,900. The anticipated work schedule is assuming a notice to proceed date <br />of March 1st, 2022. <br />COST ESTIMATE