Laserfiche WebLink
1. The final plat substantially conforms to the approved preliminary plat subject to <br />the conditions listed below. <br />2. The City Attorney has reviewed the status of title/property ownership related to <br />the final plat and provided comments as noted below. <br />3. A Development Agreement has been drafted and shall be executed. <br />4. Conditions attached to approval of the preliminary plat have been fulfilled or <br />secured by the Development Agreement. <br />5. All fees, charges and escrow related to the preliminary or final plat have been <br />paid in full. <br />BE IT FURTHER RESOLVED by the City Council of the City of Lino Lakes hereby <br />approves NorthPointe 8t' Addition PUD Final Plan/Final Plat subject to the following <br />conditions: <br />1. The existing conservation easement and wetland buffer declaration may be <br />amended with approval from RCWD. <br />2. A Development Agreement and securities related to the final plat are required. <br />3. A Site Performance Agreement and securities related to NorthPointe Garden <br />Estates are required or securities shall be collected with the Development <br />Agreement. <br />4. A Declaration for Maintenance of Stormwater Facilities related to the private <br />stormwater management facilities is required. <br />5. A Declaration of Covenants detailing age -restriction is required. <br />6. A temporary cul-de-sac easement and exhibit are required over the cul-de-sac. <br />7. Separate sign permit applications are required for all permanent monument/pylon <br />and wall signage. <br />8. Separate sign permit applications are required for all temporary signage. <br />9. PUD, Planned Unit Development flexibility is provided to reduce the principal <br />and accessory building setback along I-35E from 40ft to 20ft. <br />10. All parking stalls (surface, interior garage and detached garage) shall be provided <br />rent free to all tenants. <br />11. The following noise mitigation standards apply: <br />a. The building is constructed in such a way that the exterior to interior <br />sound level attenuation is at least 30 dB(A). <br />b. All housing units shall provide year-round climate control. <br />c. STC 30 windows shall be used for all windows. <br />d. Exterior wall construction shall consist of the following or comparable <br />materials: <br />i. APA rated sheathing located on the exterior side of the exterior <br />wall. <br />1. This material will be 7/16" thick and a wood fiber material. <br />ii. Exterior wall shall be 2x6 studs with R-21 batt insulation. <br />iii. The inside finish shall be 5/8" gypsum board. <br />iv. Lap siding shall have a thickness of .354" and be of a wood fibrous <br />material. <br />v. Trim around the windows shall have a thickness of .970" and be of <br />a wood fibrous material. <br />