My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-07-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
02-07-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:35:34 PM
Creation date
2/24/2022 4:10:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/07/2022
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Site Description <br />The development site is currently in use as part of the Robinson Landscaping, Inc. sod farm <br />agricultural use. The property also includes a residence and buildings used for operation of the sod <br />farm. The site topography is very flat with multiple ditches to provide drainage and an irrigation <br />source. <br />The property is bound by Main Street (CSAH 14) to the north and Sunset Ave (CR 53) to the west. <br />We have been working with the Anoka County Highway Department regarding their right of way <br />needs for each roadway and to request preliminary feedback on potential roadway access points. The <br />County has indicated roadway access will be made available to the property, and provided a general <br />guideline for locating new access points as depicted on the Concept Plan. Additionally, the County <br />has requested 75-feet of Right of Way dedication from the centerline of Main Street and 60-feet of <br />Right of Way dedication from the centerline of Sunset Avenue; both requests are depicted on the <br />Concept Plan. <br />Other roadway access points have been provided to the property through the Century Farm <br />development to the south at Cardinal Way, Robinson Drive, and Century Trail. Additionally, a <br />pedestrian trail has been stubbed to the property from Century Farm Addition to the south, just west of <br />the Cardinal Way street connection. <br />Adequate public water and sanitary sewer is available to the property from Century Farm development <br />to the south at Cardinal Way, Robinson Drive, and Century Trail. <br />The development site has been historically used for agriculture and currently has no significant tree <br />removal required to construct the development. <br />Braun Intertec performed a Geotechnical Evaluation Report, dated November 29, 2021, on the site. <br />The results are summarized below, with peat levels ranging from 0.5-feet to 8-feet in depth and water <br />levels ranging from 4-feet to 9-feet in depth. <br />Table 1. Subsurface Profile Summary. <br />Strata <br />Soil Type - <br />ASTM <br />Classification <br />Range of Penetration <br />ftesistaroms <br />Commentaryand Details <br />Mostly peat with lesser amounts of organic clay, lean <br />Topsoil j <br />clay, and silty sand. <br />Swamp <br />PT, QL, CL, <br />NIA <br />Thicknesses at boring locations ranged from alaout <br />SM <br />112 to 81/2 feet, <br />Deposits <br />Black and dark brown in color. <br />■ Moisture condition generally moist_ <br />■ Mixture of poorly graded sand, poorly graded sand <br />Alluvial <br />5Pr SP-SK <br />2 to 14 BPF <br />with silt, silty sandy sandy silt, and siIt- <br />Deposits <br />SM, ML <br />Generally brawn to gray in color. <br />■ Moisture condition generally moist to wet_ <br />"Abbrevlations deflned in the attached Descriptive Term Inology of Sall sheet. <br />CONCEPT PLAN SUBMITTAL December 13, 2021 <br />ROBINSON PROPERTY Page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.