My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-07-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
02-07-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:35:34 PM
Creation date
2/24/2022 4:10:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/07/2022
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />1 /5/2022 <br />Page 3 <br />Functional <br />Existing <br />Existing <br />Projected <br />Projected <br />Roadway <br />Classification <br />ADT <br />Roadway <br />2040 <br />Post <br />Recommended Improvements <br />section <br />ADT <br />2040 ADT <br />Main St <br />Principal <br />8,400 <br />2-lane <br />13,700 <br />28,000 <br />Widen to a 4-Lane section <br />(CSAH 14) <br />Arterial <br />Sunset Ave <br />Major <br />2,400 <br />2-lane <br />2,900 <br />9,000 <br />(CSAH 53) <br />Collector <br />Minor <br />Extension as a 2-lane section <br />Robinson Dr <br />Collector <br />na <br />2-lane <br />na <br />na <br />from Century Trl to 4th Ave to <br />Wood Duck Trl <br />Minor <br />Extension as a 2-lane section <br />Century Trl <br />Collector <br />na <br />2-lane <br />na <br />na <br />from Robinson Dr to Main St <br />(CSAH 14) <br />Cardinal <br />Local <br />na <br />2-lane <br />na <br />na <br />Connection to development <br />Way <br />local street <br />Complete east/west connection <br />Carl St <br />Local <br />na <br />2-lane <br />na <br />na <br />and connection to development <br />local street (currently not <br />included in Concept Plan) <br />Based on the review of the Concept Plan the following was concluded: <br />• The Concept Plan is generally consistent with the Transportation Section of the City's <br />2040 Comprehensive Plan. <br />• The completion of Carl Street and a connection to the proposed site development <br />streets should be included with the development plan. <br />• A Traffic Impact Study (TIS) should be completed to document the traffic operational <br />and safety impacts of the proposed development. The analysis would determine the <br />turn lane and traffic control needs at the adjacent intersections and site access streets. <br />• A second access to the multi -family area should be provided. <br />• The City's Comprehensive Plan identifies two trail segments and a greenway through <br />or adjacent to the proposed development. One provides a connection adjacent to <br />Century Trail from the existing trail along Robinson Drive and the other is a new trail <br />through the site from Century Farms North Park to the Main Street (CSAH 14) at <br />Sunset Avenue (CSAH 53) intersection. These trails should be included as part of the <br />Concept Plan. <br />• Wetlands <br />The site includes wetlands along the ditches and in the area north of Carl Street. An approved <br />wetland delineation will be required. The applicant will need to work with RCWD for Wetland <br />Conservation Act regulations. <br />• Landscaping <br />The landscaping will be reviewed with future submittals. <br />• Floodplain <br />Most of the site is within the City's General Floodplain District (FEMA Zone A). A Base Flood <br />Elevation will need to be determined and approved by FEMA. A LOMR will be required. RCWD will <br />require floodplain mitigation. <br />• Drainage and Utility Easements <br />Per City Code, the City requires 10-ft wide drainage and utility (D&U) easements along plat <br />Robinson Property Concept Plan Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.