My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-28-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
02-28-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:42:54 PM
Creation date
3/1/2022 11:19:41 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/28/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For residential properties, the availability charge shall be paid at the time <br />of subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the <br />time of building permit. Fees are based on the number of sanitary access <br />charge (SAC) units assigned by Metropolitan Council Environmental <br />Services (MCES). <br />City Water (CWAC) $1,473.00 Per SAC Unit. <br />C. Surface Water Management Area Charges <br />The City established a trunk area charge to uniformly distribute the costs <br />of public trunk surface water infrastructure and water quality <br />improvements. For Commercial/Industrial/Institutional properties, Surface <br />Water Management Charges shall be based on developable acreage, in the <br />amount $11,073.00/acre. <br />IF <br />Acres <br />Fee <br />1. <br />Sanitary Sewer Trunk Unit Fee ($1,630/unit; 2.92 units/Acre) <br />0.70 <br />$3,331.72 <br />2. <br />City Sewer Availability Fee ($1,525/SAC Unit) <br />TBD* <br />3. <br />Water Trunk Unit Fee ($2,34 1 /unit; 2.92 units/Acre) <br />0.70 <br />$4,785.00 <br />4. <br />City Water Availability Fee ($1,473/SAC Unit) <br />TBD* <br />5. <br />City Surface Water Management Fee ($11,073/Acre) <br />0.70 <br />$7,751.10 <br />Total Estimated (Budget) Developer Fees <br />$15,867.82 <br />*Paid at the time of Building Permit based on MCES unit determination <br />IV. RECORD DRAWINGS. <br />a. Upon project completion, Developer shall submit record drawings, in <br />electronic format, of all public and private infrastructure improvements, <br />including grading, sanitary sewer, water main, storm sewer facilities, and roads, <br />constructed by Developer. The as -built survey must include, but is not limited <br />to, proposed and final contours with adequate elevation shots to show <br />conformance, property irons (to be exposed in field), low floor and low <br />opening elevations, and the 100-Year High Water Level (HWL) of all ponds, <br />lakes, and wetland areas. The files shall be drawn in Anoka County NAD 83 <br />Coordinate system and provided in both AutoCAD .dwg and Adobe .pdf file <br />formats. The plans shall include accurate locations, dimensions, elevations, <br />grades, slopes and all other pertinent information concerning the complete work. <br />The Developer shall also submit certified compaction testing results for the <br />site grading operations. <br />Precision Tune Auto Care Site Performance Agreement page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.