Laserfiche WebLink
Findings of Fact -Specific CUP <br />Requirements <br />2. The entire area other than occupied by buildings or structures or <br />planting shall be surfaced with bituminous or concrete which will <br />control dust and drainage. The entire area shall have a perimeter curb <br />barrier, a storm water drainage system and is subject to the approval <br />of the City Engineer. <br />The PTAC development will be surfaced with bituminous material, <br />and the entire area will have a perimeter curb barrier. The City <br />Engineer has reviewed the storm water drainage system and notes <br />that some revisions will be required. <br />