Laserfiche WebLink
PROJECT NAME: <br />PROPOSAL TO: <br />Proposal <br />Lino Lakes YMCA minPool/Equip. DATE: 2/11/2022 <br />Rick DeGardner <br />Public Services Director <br />rde �ardne <br />linolakes.us <br />651.982.2444 <br />PROJECT DESCRIPTION: <br />Pool/Pool Mechanical Work Related to Re -Opening Facility. Projected fill/balance of pools in early -mid March, <br />anticipated open to Public in Spring/Summer of 2022. <br />WORK BY AQUA LOGIC INC: <br />1. Manually clean rust from SS gutter on Lap Pool & Leisure Pool. <br />2. Provide & install play feature (Aquatix Water Tent). <br />3. Feature Pump (electrical by Others). <br />4. Repair/refurbish existing pumps (Slide/Lap Recirc./Leisure Recirc.). <br />5. Provide/install correct probes for chemical controller. <br />6. Provide MDH required safety equipment: ring buoy, shepherds hook, signage, etc. <br />7. Replace side wall grates in Leisure Pool. <br />WORK NOT BY AQUA LOGIC — BY OTHERS <br />1. Replacement of rope & stanchion around slide structure. <br />2. Slide restoration (part of separate proposal). <br />3. Work related to tile decks. <br />4. No work is currently planned for the existing filters. <br />5. Electrical (related to new pump and/or existing equipment). <br />PERMITS AND FEE S <br />* Inspection costs (if required), not included. <br />* Building permit not included. <br />* Bond costs (if required) not included. <br />PROJECT TOTAL...... so 806666660606 **Sege 009000 00000*000 EGO a <br />• Add Option -replace existing Leisure Pool Heater......................................$21,500.00 <br />(gas/venting connections by Others) <br />• Note: Any additional work and/or equipment, not currently identified as work to be completed or <br />equipment deemed in need of repair, but necessary during start-up, etc. will require a change order. <br />Submitted By: <br />Ryan Johnson -Project Manager *Quote is valid for 30 days* <br />