My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-14-2022 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
02-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:39:10 PM
Creation date
3/15/2022 4:19:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/14/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NorthPointe 8tn Addition <br />Development Agreement <br />February 14, 2022 <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, until all home construction is completed, unless otherwise <br />released by the City. Warning signs shall be placed when hazards <br />develop in streets to prevent the public from traveling on them, including <br />detour signs if necessary. If and when the streets become impassable, <br />such streets shall be barricaded and closed. The Developer shall maintain <br />a smooth, hard driving surface and adequate drainage on all temporary <br />streets. <br />c. Final street and parking area grading, subbase, gravel base, concrete curb and <br />gutter, and bituminous base course and wear course shall be furnished and <br />installed. <br />d. Sidewalks, trails and lighting shall be installed within 6 months of the bituminous <br />base course. Extensions may be approved by the City Engineer, due to weather <br />conditions, upon receipt of a written request in writing by the Developer to the <br />City. In no case shall such extension extend beyond one year from the date of <br />installation of bituminous base course. <br />Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances, shall be furnished and installed. <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monuments at all lot, block, and outlot corners <br />and at all other angle points on boundary lines consistent with the final plat. <br />Iron monuments shall be placed after all street and lawn grading has been <br />completed in order to preserve the lot markers for future property owners. Lot <br />corner irons on the back property line shall be installed so that the top of the <br />iron corresponds to the finished ground elevation in accordance with the <br />approved grading plan. Guard stakes shall be appropriately installed to mark <br />these irons. <br />Landscaping shall be furnished and installed in accordance with the approved <br />plans. The landscaping shall be maintained by the Developer until accepted by <br />the City's Environmental Coordinator. <br />page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.