My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-14-2022 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
02-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:39:10 PM
Creation date
3/15/2022 4:19:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/14/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF ORIGINATOR: <br />C. C. MEETING DATE <br />TOPIC: <br />VOTE REQUIRED: <br />INTRODUCTION <br />CITY COUNCIL <br />AGENDA ITEM 6C <br />Diane Hankee, PE City Engineer <br />February 14, 2022 <br />Consider Resolution 22-23, Order Project, Approve the Plans <br />and Specifications and Authorize the Ad for Bid, 2022 East <br />Shadow Lake Drive Utility Project <br />3/5 <br />Staff is requesting Council approval to authorize the ad for bid for the 2022 East Shadow Lake <br />Drive Utility Project. <br />BACKGROUND <br />On December 13, 2021, the City Council approved the preparation of the plans and specifications <br />for the 2022 East Shadow Lake Drive Utility Project. The proposed improvements will include <br />replacement of sagging sanitary pipes, manholes, water system replacement, roadway <br />reconstruction and restoration of adjacent property at and near the intersection of East Shadow <br />Lake Drive and Lantern Lane. The project will result in reduced inflow and infiltration of <br />ground water in the sanitary sewer system. <br />The estimated total project cost is $510,000. The project is funded through the City's Sewer <br />Operating Fund. <br />The estimated schedule for the project: <br />Authorize Preparation of Plans and Specifications <br />December 13, 2021 <br />Order Improvement, Approve Plans and Specs, Authorize Ad for Bids <br />February 14, 2022 <br />City Opens Bids <br />March 22, 2022 <br />City Council Awards Contract <br />March 28, 2022 <br />Construction Begins <br />April -May, 2022 <br />Final Completion <br />October, 2022 <br />RECOMMENDATION <br />Staff is recommending approval of Resolution No. 22-23, Order Project, Approve the Plans and <br />Specifications and Authorize the Ad for Bid for the 2022 East Shadow Lake Drive Utility <br />Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.