My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/05/2020 <br />Page 7 <br />a. Provide iRV8Ft elevatiORS, slope, material, and 6iZG Of Pipe. <br />• <br />.. <br />- - An <br />Sterm Sewerwith <br />ether sterm system management design factors. <br />19. TANK AND TRENCH DRAINTILE SYSTEM: <br />a. Provide updated calculation and details regarding this system from previous <br />comments. <br />b. Show invert elevations, slope, material, and size of pipe on utility plan <br />c. Systems are not allowed to flow into the sanitary in the underground parking <br />during any design event or situation. Install a valve to protect the sanitary sewer <br />system in the parking garage. <br />AJA 7/11/2020: TANK DESIGN HAS BEEN UPDATED/REFLECTED ON THE <br />PLAN. <br />WEIS 7/27/20: MECHANICAL PLANS WILL BE PROVIDED TO SHOW THIS <br />DETAIL. <br />All previous tank and trench drain City comments have been addressed. Note <br />that there is a label conflict on sheet C1.46 for trench drain details. Details <br />regarding the pump control panel and details on electrical configuration will be <br />provided at a later time by Wold. <br />20. Applicant to update line style for storm pipe between MH 121 and FES 4 so that <br />the arrows point the way the pipe is draining. <br />21. Anoka County will review the drainage for the turn lanes. City staff anticipates <br />that they will need spread and run by calculations for the storm sewer per state <br />aid standards. City staff strongly recommends that AJA staff work with Anoka <br />County to determine storm sewer needs. <br />• Water Supply <br />The proposed site is currently not served by municipal water and on site wells shall be abandoned per <br />MDH. This area of the City, Woodridge Estates, is currently a low pressure area. The City's <br />Comprehensive Plan and water system model identifies the need for a 12-inch diameter trunk <br />watermain to be looped through the Lyngblomsten development site to serve the fire flow needs for <br />the site, and to improve flow within this area of Lino Lakes. The Lyngblomsten site will also have an 8- <br />inch diameter watermain and service lines throughout the site. <br />Comments: <br />The applicant shall provide profile views of the proposed watermain in the construction <br />plans. <br />Noted, refile plans will beprovided in the final plat doG uments <br />Staffyiill review watermain pre -files atermain layo t r nf; h;;..o hoon <br />n.irlrec sod- and the profile views areupdated. General profile n .info inGl de: <br />a. Ap;l'GaRt shall state popematerialin profile view label (i.e. Y" No I.AIATERMAIN <br />__XC <br />A IA 7 1V20-9fl• DIDC IIAATCCI AI IS CHQ_1A/NI IN' DI ANI AND PROFILE VIEWS <br />AI CA DI CACC N OTC THAT THF_ DIDC MATCCIAI IS 1 ICTF_D ANI NOTE #2 <br />Lyngblomsten Preliminary Plat Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.