My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/05/2020 <br />Page 12 <br />Landscaping being reviewed by City of Lino Lakes Environmental Coordinator. <br />COLBERG TEWS: We did not receive any review or comments from the Environmental <br />Coordinator <br />Staff recommends that no trees are planted on top of storm sewer pipes or other utilities. <br />COLBERG TEWS: Tree locations have been reviewed for conflicts with storm and other <br />utility lines and resolved. <br />Applicant shall review the tree locations as some conflict with the sanitary and water <br />services to the townhomes. It also appears that the boulevard trees near proposed lift <br />station will conflict with the sanitary sewer stubs and the watermain stubs. Review the <br />tree layout near Dry Basin 4P by FES 7 and FES 8. <br />Applicant shall update landscape plan near lift station to provide proper screening. <br />• Geotechnical <br />A geotechnical report was completed by Braun Intertec for the proposed Lyngblomsten development. <br />See PDF named "3.27.20 Letter to Diane Hankee" for additional geotechnical evaluation. <br />• Floodplain <br />Floodplain is not present on this site. <br />• Drainage and Utility Easements <br />Comments: <br />1. The private readwseuth anness shall h;;vp r1raiRage & utility easemeRt ever <br />readway for the publiG utilities. This i.vidth shaall be A- Fninirnurn ef 2-0- feet A.nd GeRtered <br />n the r ordh +ili+iec <br />Plans have been updated a errdingly <br />The plan set shall show the storm sewer plan view and easement lines on the same <br />page. This will allow the City to verify all storm and utility easements are correct. <br />See sheet C1.41, Utility Easement Plan. <br />• Development Agreement <br />A development agreement is required with the final plat. <br />• Grading Agreement <br />Not applicable at this time. <br />• Stormwater Maintenance Agreement <br />Lyngblomsten Preliminary Plat Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.