My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. <br />0 <br />U <br />z <br />w <br />m <br />U) <br />0 <br />04 <br />0 <br />V) <br />z <br />J <br />D <br />a <br />a <br />z <br />a <br />U) <br />0 <br />0 <br />w <br />U) <br />w <br />w <br />F- <br />U) <br />x <br />w <br />00 <br />wsb <br />Memorandum <br />To: Katie Larsen, City Planner, City of Lino Lakes <br />From: Diane Hankee, City Engineer, City of Lino Lakes <br />Date: August 6, 2020 <br />Re: Otter Crossing <br />Preliminary Plat Review <br />16587-000 <br />WSB has reviewed the Preliminary Plat and Utility Plans for the Otter Crossing development in <br />Lino Lakes, MN, prepared by Pioneer Engineering received on July 20, 2020. The following are <br />our review comments that should be responded to in writing by the applicant. These comments <br />are based on review of the following plan sets and documents: <br />• Otter Crossing Preliminary Plat & Site Plans prepared by Pioneer Engineering dated July <br />6, 2020 <br />• Preliminary Storm Water Management Plan prepared by Pioneer Engineering dated July <br />6, 2020 <br />• Stormwater Pollution Prevention Plan prepared by Pioneer Engineering dated June 26, <br />2020 <br />• Preliminary Geotechnical Exploration Report prepared by Haugo Geotechnical Services <br />dated February 7, 2020 <br />Engineering <br />• Grading <br />The Otter Crossing development includes site grading for the private street, the proposed <br />building and parking lot, and the stormwater basin. <br />Comments: <br />1. Applicant to confirm that the proposed 918 contour connects into the existing <br />918 contour on the east side of the building. <br />2. Applicant shall show the location of the HWL of Basin 1 P. <br />• Stormwater Management <br />The stormwater on the site flows to three different locations from the site. The northern <br />section of the property drains to the northeast to an existing wetland area which then flows <br />to the north. The southern portion of the property drains to a large wetland toward the <br />center of the property which outlets at the southwest corner through a culvert under CSAH <br />14. A small portion of the east side of the property drains to an existing storm sewer on <br />Otter Lake Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.