My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CP <br />1 <br />I <br />I <br />I <br />v � 916 <br />—L— _7- <br />7fI <br />J � <br />> > > > > <br />KF � — <br />SDD-14 <br />)OD _ 0 , <br />SSC-3 <br />19.04 <br />Er - N___ / 18.28 <br />/ x GFS-16 <br />OD F <br />L— — <br />I <br />I 18.66 <br />x <br />18.37 <br />x <br />WLC-10 <br />1 <br />� <br />KL-9 <br />t <br />°I I I I c <br />c d <br />° Al ° ° <br />d 4 ° ° d ° ° <br />° ° 4 / ° d <br />d <br />O <br />ti 14 ° <br />° d <br />° <br />C> °° ° <br />O <br />iol <br />18.66 — <br />/ x /x ilV V <br />10 <br />KF 10 <br />18.0,e \ <br />K F 17 56 <br />— �VLC-13 <br />SOD16 <br />l \ <br />9 8 \ \\ <br />\ x 17.88 \ <br />� 1 <br />i <br />NFS-15 TWN-1 <br />—oh—oh—oh �Qh oh —oh —oh —oh ah <br />-/ 918 <br />SOD <br />V <br />PI�NEERerg ineerin <br />CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS <br />WLC-1 <br />18.63 <br />KF-4.G <br />70 <br />SOD 1$ <br />I <br />I <br />I I -- -I---I�----I-�-I-----I----- <br />I <br />JTL 1 ; � <br />I <br />I <br />I I <br />KF-6 I <br />I I <br />I I i I <br />SDD-12 <br />�I <br />NFS —13 \-- —-- <br />i <br />I <br />I <br />S � <br />i <br />I I <br />I I <br />I I I <br />I I <br />—� WN-13 <br />I I <br />I I <br />I I <br />I I <br />� I <br />)--NFS-15 <br />I I <br />Go Q <br />I <br />I I <br />I I <br />I I <br />I v <br />I I <br />I rn II I <br />I <br />S D <br />I I <br />I I <br />� I <br />I I <br />WN-13 <br />I I <br />I I <br />I I <br />j v <br />I I <br />I I <br />I I <br />I <br />NFS-5— <br />I I <br />AST— 24� <br />I <br />SOD v <br />I <br />I I <br />J TL — 2 <br />WN-7 <br />NFS-15 � I <br />/ �� / hyd i I <br />oh —oh—oh— _ -- oh oh <br />fo o T o fo <br />I I <br />I I <br />I <br />I <br />I I <br />I I <br />I I <br />I I <br />I � <br />CITY LANDSCAPE REQUIREMENTS <br />40% OF VEHICULAR HARDSCAPE COVERAGE WITH <br />CANOPY. <br />VEHICULAR HARDSCAPE: APPROX. 34,276 SQ FT <br />40% REQUIREMENT=13,710 SQ FT <br />PROPOSED=9,150 SQ FT (8,400 OVERSTORY AND <br />750 ORNAMENTAL) <br />20 TREES PROPOSED <br />LANDSCAPE SCREENING BETWEEN PARKING LOT <br />AND RIGHT OF WAY. CREATE A CONTINUOUS <br />SCREEN AT A HEIGHT OF 30". DOUBLE ROW OF <br />PLANTS WITH TRIANGULATED SPACING. <br />NOTES: <br />1. PERENNIAL AREAS TO BE AMENDED WITH <br />COMPOST/PLANTING SOIL TO A DEPTH OF 6" <br />2. PLANTING BEDS THAT ABUT SOD SHALL BE <br />EDGED WITH STEEL EDGER <br />3. PLANTING BEDS TO BE MULCHED WITH <br />1.25-1.5" RIVER ROCK TO A DEPTH OF 3" <br />4. RIVER ROCK LAID OVER FIBER MAT WEED <br />BARRIER <br />5. SODDED AREAS AS NOTED ON PLAN TO BE <br />IRRIGATED. <br />6. SOD USED BETWEEN PLANTING BEDS AND <br />ADJACENT STREET CURBS. <br />7. IRRIGATION DESIGNED BY OTHERS. <br />LANDSCAPE NOTES <br />PLANTING SCHEDULE <br />KEY <br />COMMON NAME SCIENTIFIC NAME <br />ROOT <br />QUANTITY <br />OVERSTORY TREES <br />THORNLESS HONEYLOCUST/GLEDITSIA TRIACANTHOS VAR INEMIS <br />2.5" B&B <br />4 <br />AUTUMN BLAZE MAPLE/ACER X FREEMANII <br />2.5" B&B <br />6 <br />SENTRY LINDEN/TILIA AMERICANA 'SENTRY <br />2.5" B&B <br />4 <br />ORNAMENTAL TREES <br />JTL <br />JAPANESE TREE LILAC/SYRINGA RETICULATA <br />#3 POT <br />3 <br />SSC <br />SPRING SNOW CRAB/MALUS 'SPRING SNOW' <br />#3 POT <br />3 <br />SHRUBS <br />NFS <br />NEON FLASH SPIREA/SPIRAEA X BUMALDA 'NEON FLASH' <br />#3 POT <br />63 <br />TWN <br />TINY WINE NINEBARK/PHYSOCARPUS OPULIFOLIUS 'SMPOTW #3 <br />POT <br />52 <br />GFS <br />GOLDFLAME SPIREA/SPIRAEA X BUMALDA 'GOLDFLAME' <br />#3 POT <br />16 <br />DKL <br />DWARF KOREAN LILAC/SYRINGA MEYERI 'PALABIN' <br />#3 POT <br />9 <br />EMH <br />EMERALD MOUND HONEYSUCKLE/LONICERA XYLOSTEUM 'E.M.' <br />#3 POT <br />11 <br />RPW <br />RED PRINCE WEIGELA/WEIGELA FLORIDA 'RED PRINCE' <br />#3 POT <br />5 <br />JWS <br />JAPANESE WHITE SPIREA/SPIRAEA ALBIFLORA <br />#3 POT <br />18 <br />PERENNIALS <br />SDD <br />STELLA D'ORO DAYLILY/HEMORCALIS 'STELLA D'ORO' <br />#1 POT <br />31 <br />AST <br />FANAL ASTILBE/ASTILBE ARENDSII 'FANAL' <br />#1 POT <br />50 <br />KF <br />KARL FOERSTER GRASS/CALAMAGROSTIS X ACUTIFLORA 'K.F.' <br />#1 POT <br />35 <br />WLC <br />WALKERS LOW CATMINT/NEPETA X FAASSENII 'WALKERS LOW #1 <br />POT <br />41 <br />- THE LANDSCAPE CONTRACTOR SHALL VISIT THE PROJECT SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS <br />PRIOR TO SUBMITTING A BID. <br />- THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF PROPOSED PHYSICAL START DATE AT <br />LEAST 7 DAYS IN ADVANCE. <br />- THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FIELD VERIFICATION OF ALL EXISTING UTILITY <br />LOCATIONS ON THE PROJECT SITE WITH GOPHER STATE ONE CALL 1-800-252-1166 PRIOR TO COMMENCING WORK. <br />THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF EXISTING UTILITIES <br />DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. NOTIFY THE LANDSCAPE ARCHITECT OF ANY CONFLICTS <br />TO FACILITATE PLANT RELOCATION. <br />- GRADING TO BE PERFORMED BY OTHERS. <br />- NO PLANT MATERIAL SHALL BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE <br />IMMEDIATE AREA. <br />- ALL PLANT MATERIAL SHALL MEET THE STANDARDS FOUND IN THE AMERICAN ASSOCIATION OF <br />NURSERYMEN-AMERICAN STANDARD FOR NURSERY STOCK. <br />- ALL CONTAINER MATERIAL TO BE GROWN IN THE CONTAINER A MINIMUM OF SIX (6) MONTHS PRIOR TO PLANTING ON <br />SITE. <br />- DECIDUOUS AND CONIFEROUS TREES SHALL NOT BE STAKED, BUT THE LANDSCAPE CONTRACTOR MUST GUARANTEE <br />STANDABILITY TO A WIND SPEED OF 60 M.P.H. <br />- THE LANDSCAPE CONTRACTOR SHALL PROVIDE A MINIMUM GUARANTEE OF ONE YEAR ONE TIME REPLACEMENT ON <br />NEW PLANT MATERIALS. GUARANTEE SHALL BE AGREED UPON BY DEVELOPER/BUILDER AND LANDSCAPE CONTRACTOR. <br />- THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED UNSATISFACTORY <br />BEFORE, DURING OR AFTER INSTALLATION. <br />- IF THERE IS A DESCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ON THE PLAN AND THE NUMBER SHOWN ON <br />THE PLANT LIST, THE NUMBER SHOWN ON THE PLAN WILL TAKE PRECEDENCE. <br />-THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO <br />COMPLETE WORK SHOWN ON THE PLAN. THE LANDSCAPE CONTRACTOR SHALL VERIFY ALL QUANTITIES SHOWN ON THE <br />PLANT SCHEDULE. <br />- COMMERCIAL GRADE POLY LAWN EDGING SHALL BE INSTALLED WHERE NOTED. <br />- THE LANDSCAPE CONTRACTOR SHALL REPAIR ALL DAMAGE TO THE SITE CAUSED BY THE PLANTING OPERATION AT <br />NO COST TO THE OWNER. <br />- THE LANDSCAPE CONTRACTOR SHALL KEEP PAVEMENTS CLEAN UNSTAINED. ALL PEDESTRIAN AND VEHICLE ACCESS <br />TO BE MAINTAINED THROUGHOUT CONSTRUCTION PERIOD. ALL WASTES SHALL BE PROMPTLY REMOVED FROM THE SITE. <br />ANY DAMAGE TO EXISTING FACILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. <br />- THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES, REGULATIONS AND PERMITS <br />GOVERNING THE WORK. <br />- STORAGE OF MATERIALS OR SUPPLIES ON -SITE WILL NOT BE ALLOWED. <br />0 10 20 40 <br />GRAPHIC SCALE IN FEET <br />SHRUB PLANTING DETAIL <br />SCARIFY BOTTOM AND SIDES <br />a PLUMB AND BACKFILL WITH <br />OF HOLE PRIOR TO PLANTING. <br />o BACKFILL SOIL. <br />TRIM OUT DEAD WOOD AND a <br />WATER TO SETTLE PLANTS <br />WEAK AND/OR DEFORMED o <br />gyp° <br />o AND FILL VOIDS. <br />TWIGS. DO NOT CUT A ° <br />o <br />LEADER. DO NOT PAINT CUTS. ,, <br />WATER WITHIN TWO HOURS OF <br />o <br />INSTALLATION. WATERING <br />SET PLANT ON UNDISTURBED ;" o <br />°• o MUST BE SUFFICIENT TO <br />NATIVE SOIL OR THOROUGHLY a <br />a o THOROUGHLY SATURATE <br />COMPACTED BACKFILL SOIL. <br />ROOT BALL AND PLANTING <br />INSTALL PLANT SO THE ROOT <br />HOLE. <br />FLARE IS AT OR UP TO 2" <br />__— I I- <br />ABOVE THE FINISHED GRADE. -1 <br />—_—_—PLACE <br />MULCH WITHIN 48 <br />I I —III —III <br />I I I I -I I=1 HOURS OF THE SECOND <br />REMOVE PLASTIC, METAL, I —I I <br />—I I I I—� WATERING UNLESS SOIL <br />1 <br />WOOD OR FIBER CONTAINER =III —III -I <br />_ <br />I I -I I MOISTURE IS EXCESSIVE. <br />AND SCORE OUTSIDE OF SOIL <br />MASS WITH SHARP KNIFE. —III-I I <br />—III—III—III—III—III-I <br />I <br />III—� I SHREDDED WOOD MULCH MAX. <br />PLANTS CAN BE PLANTED IN 1—III <br />I IT I ITT—TI I ITT—TI <br />I ITT—TI I ITT—TI I I -I <br />ITT—�I I I- 3" DEEP (DO NOT PLACE <br />A DEGRADABLE POT, THE <br />=III=III=III=III=III= <br />III= MULCH AGAINST STEM OF <br />CONTAINER MUST BE SLIT <br />SHRUB). <br />VERTICALLY AT 6" INTERVALS. <br />2-3 TIMES BALL <br />DIAMETER <br />DECIDUOUS TREE PLANTING <br />DETAIL <br />p p44 p 4 <br />o <br />TRIM OUT DEAD WOOD AND <br />a <br />WATER TO SETTLE PLANTS AND <br />WEAK AND/OR DEFORMED <br />p p <br />FILL VOIDS. <br />TWIGS. DO NOT CUT A <br />° o <br />LEADER. DO NOT PAINT <br />p 4 <br />WATER WITHIN TWO HOURS OF <br />CUTS. <br />p 4 p <br />INSTALLATION. WATERING MUST <br />p 4 a <br />°p p <br />BE SUFFICIENT TO THOROUGHLY <br />SET PLANT ON <br />p <br />p <br />SATURATE ROOT BALL AND <br />UNDISTURBED NATIVE SOIL <br />p o <br />PLANTING HOLE. <br />OR THOROUGHLY <br />o <br />p ° <br />PLACE MULCH WITHIN 48 HOURS <br />COMPACTED BACKFILL <br />SOIL. INSTALL PLANT SO <br />op <br />p p 4 4 ° 4 <br />4 <br />OF THE SECOND WATERING <br />THE ROOT FLARE IS AT <br />p 4yp <br />UNLESS SOIL MOISTURE IS <br />OR UP TO 2" ABOVE THE <br />as o 4 apo <br />EXCESSIVE. <br />FINISHED GRADE. <br />4 SHREDDED WOOD MULCH MIN. 3" <br />PLACE PLANT IN PLANTING <br />ppp o� <br />DEEP (DO NOT PLACE MULCH <br />HOLE WITH BURLAP AND <br />AGAINST TRUNK OF TREE). <br />WIRE BASKET, (IF USED), <br />INTACT. BACKFILL WITHIN <br />PLUMB AND BACKFILL WITH <br />APPROXIMATELY 12" OF <br />BACKFILL SOIL. BREAK DOWN <br />THE TOP OF ROOTBALL, <br />SIDES OF HOLE WHEN <br />WATER PLANT. REMOVE <br />BACKFILLING. <br />TOP )j OF THE BASKET OR <br />THE TOP TWO HORIZONTAL <br />RINGS, WHICHEVER IS I <br />III -I I —I III —I I —I <br />GREATER. REMOVE ALL <br />II <br />BURLAP AND NAILS FROM <br />1 �r <br />II <br />TOP OF THE BALL. <br />REMOVE ALL TWINE. <br />III <br />I I=III-I <br />III— I I I II <br />TTT TTT�TT TTT�TT TTT _T <br />I <br />=1 I -I I -III -I I -III -III -I I �I I I II <br />SCARIFY BOTTOM AND <br />SIDES OF HOLE PRIOR TO <br />;1I�I1 IIII�I <br />PLANTING. <br />IIIIIIIIIII�II�IIIII�III�III <br />2-3 TIMES BALL DIAMETER <br />2422 Enterprise Drive (651) 681-1914 <br />Mendota Heights, MN 55120 Fax: 681-9488 <br />www.pioneereng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.