My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The applicant has been approved for tax incremental financing to assist with the <br />development of this project. <br />Overall, the PUD Final Plan is consistent with the general goals of the Master Plan. <br />Transportation and Access <br />• Accesses to Hodgson Road and Co. Rd. J are to be located at the points indicated on <br />the Master Plan. <br />The City of Lino Lakes, the City of Shoreview, Anoka County and Ramsey County have <br />been working together the with the applicant for the past 2+ years on right-of-way <br />acquisition, access points and intersection improvements. Lyngblomsten hired SEH to <br />prepare an Intersection Analysis and Alternatives report for the entire CSAH 49 <br />(Hodgson Road) and CR J (Ash Street) intersection and preliminary concept plans <br />provide for additional turn lanes to mitigate traffic. Both roads are County roads and <br />ultimately fall under their jurisdiction. <br />o There is to be one full access on Hodgson Road, located 990± ft north of the CR J <br />intersection (approx. 330 ft south of the northern edge of the study area). This <br />access is to be centered on the property line east of Hodgson at this location. No <br />other new permanent accesses are to be allowed. As development occurs, the <br />City will work toward eliminating all other accesses along Hodgson. <br />Access to Hodgson Road is proposed at two locations: a full movement access <br />approximately 1000 ft north of CR J that is consistent with the Master Plan and a right- <br />in/right-out access approximately 440 ft north of CR J. This second access will improve <br />circulation and accessibility to the site and is recommended by staff. <br />The north access has a southbound 12 ft wide right turn lane, a 12 ft wide thru lane and a <br />varying width left turn striped median that provides access to 6064 & 6074 Hodgson <br />Road (Rock Gardens). Northbound lanes include a 12 ft left turn lane, 12 ft wide thru <br />lane and the existing right turn paved shoulder. <br />The south access is Right In/Right Out only. It has a southbound 13 ft wide right turn <br />lane, a 12 ft wide thru lane and 12 ft wide left turn striped median that provides access to <br />6020 & 6034 Hodgson Road (Bob's Auto Ranch). Northbound lanes include a 12 ft wide <br />thru lane and existing right turn paved shoulder. <br />o West of Hodgson Rd., there is to be one access onto CR J, located as far west as <br />possible from the Hodgson/CR J intersection. This new access is to be <br />constructed as right Wright out only. This will be a driveway into the <br />development site, and there will be access easements on that site to provide <br />access to, from, and through property to the north, leading to the full access on <br />X <br />
The URL can be used to link to this page
Your browser does not support the video tag.