My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/12/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
08/12/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 11:34:25 AM
Creation date
3/16/2022 10:24:17 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/12/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The Hodgson/CR J intersection is to be signalized prior to or as part of any <br />significant development in the study area. This is to be a cooperative effort of Anoka <br />and Ramsey Counties, the Cities of Lino Lakes and Shoreview, and developers. <br />Specific design requirements are to be determined. <br />Signals were installed at the intersection in 2008 and modified in 2017. <br />• Other road improvement needs such as additional lanes, median, and the like will be <br />designed in cooperation with Anoka and Ramsey Counties, the Cities of Lino Lakes <br />and Shoreview, and developers, as appropriate. Specific design requirements are to <br />be determined. <br />Lyngblomsten hired SEH to prepare an Intersection Analysis and Alternatives report for <br />the entire CSAH 49 (Hodgson Road) and CR J (Ash Street) intersection. The proposed <br />improvements have been noted above. <br />Anoka County Highwqy Department is proposing to be the lead agency on design and <br />letting of the CSAH 49 and CR J road and intersection reconstruction project. Cost <br />sharing details between the entities will be finalized when estimates are complete. <br />Potential road reconstruction will be in 2022 to coincide with the Lyngblomsten <br />development. <br />• The quantity of development of the area will be limited to ensure that traffic <br />generation does not exceed the capacities of Hodgson Road, the intersection with Co <br />Rd J, or the new access. Development shall not create the need for a traffic signal at <br />the new full access on Hodgson Road. <br />o Planning for the area must look forward to full development of the study <br />area so as not to allow one project to "use up capacity" so that other sites <br />cannot develop without creating the need for a signal at the new access. <br />As noted, a traffic analysis was completed for the development. Peak trip generation <br />from the proposed development is approximately 1/3 of the trip generation provided for <br />in the Master Plan. No signal is proposed at the new full access. <br />• Right of way will be dedicated with development to ensure adequate right of way for <br />Hodgson and CR J as well as for the internal circulation system, as necessary. <br />The final plat dedicates additional right-of-way ranging from 27 ft to 45 ft along CSAH <br />49 (Hodgson Road) creating 60 ft to 75 ft of dedicated right-of-way from section line <br />and/or roadway centerline. <br />The final plat also dedicates an additional 10-17 ft of right-of-way along CR J (Ash <br />Street) to provide a fu1160 ft from section line. <br />The internal public road is dedicated with 60 ft of right-of-way. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.