My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-030 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-030 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 7:26:42 PM
Creation date
3/18/2022 9:52:23 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/14/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(g) Prepare a site plan showing existing and proposed grade elevations and effect of <br /> storm water drainage on adjacent areas. <br /> A site plan showing the existing and proposed grade elevations for the proposed <br /> earth moving/black dirt stockpile was provided. <br /> (h) Specify a time when the excavation or land reclamation project shall be completed. <br /> The proposed earth moving/black dirt operations will occur in the summer months. <br /> The conditional use permit will be reviewed every three (3)years for renewal. <br /> Renewal shall be approved by City Council. <br /> (i) Place a minimum of four(4) inches of top soil over the completed project and <br /> establish appropriate ground cover within sixty(60) days of completion, or in a time <br /> period consistent with the City's stormwater management and pollution prevention <br /> plan. <br /> The proposed black dirt stockpile shall be seeded or hydromulched within seven (7) <br /> days of initial placement. Once the stockpile has been relocated to the site, at least <br /> 50%of the stockpile shall be stabilized and remain stabilized with vegetation at all <br /> times. <br /> (j) Reimburse the City for the cost of periodic inspections by the City for the purpose of <br /> determining that the terms under which the permit has been issued are being complied <br /> with. <br /> The City will maintain a$5,000 non-interest bearing escrow account provided by the <br /> owner that shall be reestablished annually by January 15`h. This escrow will be for <br /> inspection, erosion control, and other City costs associated with the operation of the <br /> stockpile. <br /> If the above escrow amount is insufficient, the owner shall make such additional <br /> deposits as required by the City. The City shall have a right to reimburse itself from <br /> the Escrow with suitable documentation supporting the charges. <br /> (k) Implement the tree preservation plan. <br /> Not applicable to this site. <br /> (1) In addition to a conditional use permit,the City Engineer may determine that permits <br /> in excess of twenty-five thousand(25,000)cubic yards require the applicant to <br /> conduct a neighborhood meeting and to notify affected property owners within one- <br /> quarter(1/4)mile. <br /> Properties within 350 feet, as required for CUP's, and the City of Centerville were <br /> notified.A neighborhood meeting is not proposed at this time. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.