My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2022-033 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2022
>
2022-033 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 7:26:47 PM
Creation date
3/18/2022 9:55:33 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/14/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES <br /> RESOLUTION NO.22-33 <br /> RESOLUTION APPROVING MEMORANDUM OF UNDERSTANDING WITH RICE <br /> CREEK WATERSHED DISTRICT <br /> SHENANDOAH PARK BMP FEASIBILITY STUDY <br /> WHEREAS,the 2009 Rice Lake Stormwater Retrofit Assessment(SRA),prepared by the Rice <br /> Creek Watershed District and the Anoka Conservation District provided a blueprint to improve <br /> stormwater quality and reduce the volume of runoff entering the stormwater system from <br /> neighborhoods that contribute to the degradation of Rice Lake; and <br /> WHEREAS, on September 27, 2013 the U.S. Environmental Protection Agency approved the <br /> District's Lino Lakes Chain of Lakes Nutrient Total Maximum Daily Load Study,with the <br /> purpose of quantifying the total phosphorus loading reductions needed for Rice Lake, and others, <br /> to meet state water quality standards; and <br /> WHEREAS,the development of content within the SRA included review and input from other <br /> partners in the Rice Lake Subwatershed, including the City of Lino Lakes and <br /> WHEREAS,the SRA includes a project concept for the City's Shenandoah Park, suggesting it as <br /> an ideal location to develop a project to improve water quality by reducing total phosphorus <br /> loads and runoff rates, and potentially restoring previously drained wetland areas, collectively <br /> resulting in improvements to Rice Lake; and <br /> WHEREAS,the SRA establishes that a feasibility study including additional engineering and <br /> modeling is required to analyze potential project concepts, and their respective benefits, for <br /> Shenandoah Park(Study); and <br /> WHEREAS,the Study will provide valuable information should either the City or RCWD pursue <br /> external grant funding for a proposed water quality improvement project in Shenandoah Park in <br /> the future; and <br /> WHEREAS,the City desires to proceed with the aforementioned Study to further develop <br /> project concepts for Shenandoah Park; and, <br /> WHEREAS,the RCWD desires to cooperate with the City by providing cost-share assistance for <br /> the Study; <br /> NOW,THEREFORE,BE IT RESOLVED by the City Council of the City of Lino Lakes hereby <br /> approves the MOU with the RCWD and authorizes the Mayor and City Clerk to execute the <br /> agreement on behalf of the City. <br /> BE IT FURTHER RESOLVED,that City staff are hereby authorized and directed to enter into a <br /> contract with WSB for the preparation of the Shenandoah Park BMP Feasibility Study in the <br /> amount of$21,925. <br />
The URL can be used to link to this page
Your browser does not support the video tag.