Laserfiche WebLink
CATCHMENT PROFILE: RL-13 <br />Rice Lalze Subwatershed Assessment <br />Site Selection: <br />In order to maximize the treatment <br />potential of each rain garden, <br />properties furthest "downhill" or near a <br />catch basin should be targeted as high <br />priority sites. Properties near the high <br />point in a road or immediately downhill <br />from a catch basin are low priority <br />because they will be less likely to <br />intercept large amounts of stormwater. <br />The following map highlights high and <br />low priority properties. Properties not <br />highlighted can be targeted for rain <br />garden retrofits if additional treatment <br />is desired. Lack of landowner <br />participation and additional site <br />constraints may eliminate some high <br />priority properties, and adjacent <br />upstream properties should be <br />pursued. See appendix A for curb -cut <br />rain garden site considerations and <br />designs. <br />RL12° e <br />�]'n� RL-9 <br />'q 1 <br />HPNRHO <br />r r <br />RLV31 <br />t: <br />h j�raoN �R� � _ _ <br />-• - - <br />w <br />f . <br />Legend <br />s2rl�Ave--" <br />CATCHMENT BOJNCAN <br />•L`,�, w <br />• CATCH BASIN <br />• CUTFALL <br />- <br />STORM $EWER LINE <br />Raingareen Priority <br />High ariority <br />I e, Priority <br />