Laserfiche WebLink
NO. Print History Date <br />Project <br />Checked <br />Drawn <br />18615 <br />TRG <br />JJD <br />OTTER LAKE ANIMAL <br />CARE CENTER <br />6848 OTTER LAKE RD, HUGO, MN 55038 <br />OTTER LAKE <br />ANIMAL CARE <br />CENTER <br />6848 OTTER LAKE RD, <br />HUGO, MN 55038 <br />NO. Description Date <br />Review Date <br />License No. <br />Date <br />I hereby certify that this plan, specification or report was <br />prepared by me or under my direct supervision and that <br />I am a duly Licensed Landscape Architect under the laws <br />of the State of Minnesota. <br />Project Lead <br />Drawn By <br />Checked By <br />Loucks Project No. <br />Chad E. Feigum - PLA <br />46508 <br />18615 <br />JJD <br />CEF <br />CEF <br />04/11/22 <br />04/11/22 <br />01 SITE PLAN REVIEW 03-24-22 <br />02 CITY COMMENTS 04-11-22 <br />PERENNIAL PLANTING <br />SCALE: 3/4" = 1'-0"Perennial.Dwg <br />LOOSEN ROOTS OF <br />PLANT MATERIAL PRIOR <br />MULCH - 3" MIN. DEPTH <br /> - SEE NOTES OR SPECS. <br />EDGER - SEE NOTES OR SPECS. <br />12" DEPTH (MIN). LOAM PLANTING <br />SOIL - SEE NOTES OR SPECS. <br />VARIES <br />SEE PLAN <br />TO PLANTING <br />EDGE VARIES - SEE PLAN <br />X <br />XX <br />REFER TO PLAN <br />18" MIN. <br />SCALE: 3/4" = 1'-0" <br />SHRUB PLANTING DETAIL <br />SHRUBS TO BE PLACED SO THAT <br />TOP OF CONTAINER SITS FLUSH <br />WITH PROPOSED GRADE. <br />MULCH - 3" DEPTH - SEE NOTES OR SPEC. <br />LANDSCAPE FABRIC - SEE NOTES OR SPEC. <br />EDGING MATERIAL - SEE NOTES OR SPEC. <br />EDGE VARIES - REFER TO PLAN <br />PLANTING SOIL - SEE NOTES OR SPEC. <br />LOOSEN ROOTS OF ALL <br />CONTAINERIZED PLANTS. <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE PRIOR TO PLANTING <br />BUILDING WALL (TYP) <br />X <br />XX <br />LANDSCAPE INSTALLATION: <br />COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING <br />INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. <br />NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND <br />CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. <br />WHERE SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SEED SHALL BE <br />HELD 1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC. <br />SOD ALL DESIGNATED AREAS DISTURBED DUE TO GRADING. SOD SHALL <br />BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED <br />JOINTS. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD <br />SHALL BE STAKED TO THE GROUND. <br />ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE <br />AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF <br />NURSERYMEN. UNLESS NOTED OTHERWISE, ALL SHRUBS SHALL HAVE AT <br />LEAST 5 CANES AT THE SPECIFIED MINIMUM SHRUB HEIGHT OR WIDTH. <br />ORNAMENTAL TREES SHALL HAVE NO V CROTCHES AND SHALL BEGIN <br />BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND <br />BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE <br />FINISHED GRADE. <br />ANY CONIFEROUS TREE PREVIOUSLY PRUNED FOR CHRISTMAS TREE SALES <br />SHALL NOT BE USED. ALL CONIFEROUS TREES SHALL BE FULL FORM, <br />NATURAL TO THE SPECIES, WITHOUT PRUNING. <br />PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN <br />QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. <br />NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS <br />APPROVAL IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THE <br />LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A BID AND/OR <br />QUOTATION. <br />ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN ON <br />PLAN. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY <br />BE NEEDED IN FIELD. SHOULD AN ADJUSTMENT BE ADVISED, THE <br />LANDSCAPE ARCHITECT MUST BE NOTIFIED. <br />ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH A <br />27-3-3 SLOW RELEASE FERTILIZER MIXED IN WITH THE PLANTING SOIL PER <br />THE MANUFACTURER'S INSTRUCTIONS. PLANTS MAY BE TREATED FOR <br />SUMMER AND FALL INSTALLATION WITH AN APPLICATION OF GRANULAR <br />27-3-3 AT 6 OZ PER 2.5" CALIPER PER TREE AND 3 OZ PER SHRUB WITH AN <br />ADDITIONAL APPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE <br />TREE SAUCER. <br />ALL PLANTING AREAS RECEIVING PERENNIALS, GROUND COVER, <br />ANNUALS, AND/OR VINES SHALL RECEIVE A MINIMUM OF 12" DEPTH OF <br />PLANTING SOIL CONSISTING OF 5 PARTS CLEAN TOPSOIL AND 1 PART <br />PEAT. SHRUBS AND TREES TO BE BACKFILLED WITH SAME PLANTING SOIL. <br />ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. REMOVE ALL <br />FLAGGING AND LABELS FROM PLANTS. <br />WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER IN <br />CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY, <br />WATERPROOF CREPE PAPER MANUFACTURED FOR THIS PURPOSE. WRAP <br />ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND REMOVE <br />ALL WRAPPING AFTER 5-1. <br />BLACK POLY EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS, AND <br />ANNUALS WHERE BED MEETS SEED UNLESS NOTED OTHERWISE. <br />ALL ANNUAL AND PERENNIAL PLANTING BEDS TO RECEIVE 3" DEEP <br />SHREDDED HARDWOOD MULCH WITH NO WEED BARRIER. <br />ALL SHRUB BED MASSINGS TO RECEIVE 3" DEEP SHREDDED HARDWOOD <br />MULCH AND FIBER MAT WEED BARRIER. ALL TREES TO RECEIVE 4" DEEP <br />SHREDDED HARDWOOD MULCH WITH NO MULCH IN DIRECT CONTACT <br />WITH TREE TRUNK. <br />SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER <br />MANUFACTURER'S RECOMMENDATIONS UNDER ALL MULCHED AREAS. <br />MAINTENANCE STRIPS TO HAVE EDGER AND MULCH AS SPECIFIED / <br />INDICATED ON DRAWING OR IN SPECIFICATION. <br />IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY <br />DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY <br />OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT <br />ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING THESE <br />DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR <br />TO PROCUREMENT AND/OR INSTALLATION. <br />CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER <br />ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS. <br />CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL <br />NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY <br />ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER <br />ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE <br />PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, <br />FERTILIZATION AND DISEASE/PEST CONTROL. <br />CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE <br />CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE. <br />WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS <br />SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE <br />ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE <br />MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. <br />UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING PLANT <br />MATERIAL INSTALLATION AND SOD PLACEMENT IS FROM THE TIME <br />GROUND HAS THAWED TO JUNE 15. <br />FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 - NOVEMBER <br />1. FALL CONIFEROUS PLANTING MAY OCCUR FROM AUGUST 15 - <br />OCTOBER 1 AND DECIDUOUS PLANTING FROM THE FIRST FROST UNTIL <br />NOVEMBER 15. PLANTING OUTSIDE THESE DATES IS NOT RECOMMENDED. <br />ANY ADJUSTMENT MUST BE APPROVED IN WRITING BY THE LANDSCAPE <br />ARCHITECT. <br />PROTECT ALL EXISTING OAKS ON SITE SCHEDULED TO REMAIN. IF <br />EXISTING OAKS ARE DAMAGED IN ANY MANNER, ABOVE OR BELOW <br />GROUND IN THE ROOT SYSTEM, AN ASPHALTIC TREE PRUNING PAINT <br />SHOULD BE APPLIED IMMEDIATELY AFTER WOUNDING. OAKS ARE NOT TO <br />BE PRUNED, REMOVED OR TRANSPLANTED BETWEEN APRIL 15 AND JULY 1. <br />NOTIFY LANDSCAPE ARCHITECT IF THESE DATES ARE UNAVOIDABLE. <br />LANDSCAPE CONTRACTOR SHALL ESTABLISH TO HIS SATISFACTION THAT <br />SOIL AND COMPACTION CONDITIONS ARE ADEQUATE TO ALLOW FOR <br />PROPER DRAINAGE AT AND AROUND THE BUILDING SITE. <br />Deciduous Tree.DWG <br />DECIDUOUS TREE PLANTING DETAIL <br />SCALE: 1/2" = 1'-0" <br />2x ROOT BALL WIDTH <br />CONTRACTOR IS RESPONSIBLE FOR TESTING <br />PERCOLATION RATES PRIOR TO PLANTING.NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IFPOOR DRAINAGE EXISTS. <br />SET PLANT ON UNDISTURBED NATIVE SOIL <br />SCARIFY BOTTOM AND SIDES OF HOLE PRIORTO PLANTING <br />EDGE VARIES - SEE PLAN <br />WOOD STAKE (OPTIONAL) <br />MULCH - 4" DEEP. NO MULCH IN CONTACTWITH TRUNK - SEE NOTES OR SPECS. <br />ROOT FLARE EVEN WITH OR JUST ABOVE GRADE. <br />SAFETY FLAGGING - ONE PER WIRE <br />TREE WRAP TO FIRST BRANCH <br />16"x2" POLYPROPYLENE OR POLYETHYLENE STRAP <br />WATER TREE THOROUGHLY DURING PLANTING <br />OPERATIONS. PLACE BACKFILL IN 8-12" LIFTS ANDSATURATE SOIL WITH WATER. DO NOT COMPACTMORE THAN NECESSARY TO MAINTAIN PLUMB. <br />CUT BACK WIRE BASKET <br />PRUNE DAMAGED AND CROSSING BRANCHES <br />AFTER PLANTING IS COMPLETE. <br />THE CONTRACTOR IS RESPONSIBLE FOR <br />MAINTAINING ALL TREES IN A PLUMB POSITIONTHROUGH THE WARRANTY PERIOD. STAKING ISSUGGESTED, BUT NOT REQUIRED. ANY STAKING <br />MUST CONFORM WITH PRACTICES AS DEFINED INA.N.A. GUIDELINES FOR STANDARD PRACTICES <br />BACKFILL WITH IN SITU TOPSOIL <br />X <br />XX Coniferous Tree.DWG <br />CONIFEROUS TREE PLANTING DETAIL <br />SCALE: 1/2" = 1'-0" <br />2 x ROOT BALL WIDTH <br />THE CONTRACTOR IS RESPONSIBLE FOR <br />MAINTAINING ALL TREES IN A PLUMB POSITION <br />THROUGH THE WARRANTY PERIOD. STAKING IS <br />SUGGESTED, BUT NOT REQUIRED. ANY STAKING <br />MUST CONFORM WITH PRACTICES AS DEFINED IN <br />A.N.A. GUIDELINES FOR STANDARD PRACTICES. <br />PRUNE ANY DAMAGED BRANCHES AFTER <br />PLANTING IS COMPLETE. <br />16"x2" POLYPROPYLENE OR POLYETHYLENE STRAP <br />SAFETY FLAGGING - ONE PER WIRE <br />BACKFILL WITH IN SITU TOPSOIL <br />WOOD STAKE (OPTIONAL) <br />EDGE VARIES - SEE PLAN <br />CONTRACTOR IS RESPONSIBLE FOR TESTING <br />PERCOLATION RATES PRIOR TO PLANTING. <br />NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY <br />IF POOR DRAINAGE EXISTS. <br />ROOT BALL SET ON UNDISTURBED SUBGRADE <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE PRIOR TO PLANTING <br />WATER TREE THOROUGHLY DURING PLANTING <br />OPERATIONS. PLACE BACKFILL IN 8-12" LIFTS AND <br />SATURATE SOIL WITH WATER. DO NOT COMPACT <br />MORE THAN NECESSARY TO MAINTAIN PLUMB. <br />MULCH - 4" DEEP - SEE NOTES OR SPECS. MULCH <br />MUST NOT BE IN CONTACT WITH TRUNK. <br />X <br />XX <br />IRRIGATION NOTES: <br />VERIFY EXISTING/PROPOSED IRRIGATION SYSTEM LAYOUT AND <br />CONFIRM COMPLETE LIMITS OF IRRIGATION PRIOR TO SUPPLYING <br />SHOP DRAWINGS. <br />LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING <br />AN IRRIGATION LAYOUT PLAN AND SPECIFICATION AS A PART OF THE <br />SCOPE OF WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE <br />LANDSCAPE ARCHITECT PRIOR TO ORDER AND/OR INSTALLATION. IT <br />SHALL BE THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO INSURE <br />THAT ALL SODDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, <br />INCLUDING THOSE AREAS DIRECTLY AROUND AND ABUTTING <br />BUILDING FOUNDATION. <br />THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN <br />IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE <br />CONDITIONS AND TO PLANT MATERIAL GROWTH REQUIREMENTS. <br />IRRIGATION SYSTEM IS NOT TO SPRINKLE ACROSS PAVEMENT. THE <br />SYSTEM SHALL INCORPORATE A RAIN SENSOR INTO IRRIGATION <br />SYSTEM. <br />PLANTINGS OUTSIDE THE LIMITS OF IRRIGATION ARE TO BE WATERED <br />REGULARLY UNTIL PLANTING AND SOD HAS BEEN ESTABLISHED. <br />LANDSCAPE DETAIL <br />SHEET <br />L2-1