<br />Drawing: V:\040069 - Tidal Wave Auto Spa\040069-01-015 (ENG) - Lino Lakes, MN\Engineering\Engineering Plans\Sheet Sets\11-040069-01-015-LSP.dwg ;L1.1 Landscape DetailsPlot Date/Time: Mar. 10, 22 - 16:11:30User: DHALLNWC OF OTTER LAKE AND MAIN STREET,LINO LAKES, MN 55038AS SHOWN © Bowman Consulting Group, Ltd.ARBPE Firm Registration No. 3548Know what's below.before you dig.Call
<br />R
<br />GENERAL LANDSCAPE NOTES
<br />PLANTING:
<br />1. THIS PLAN SHALL BE USED FOR LANDSCAPE PLANTING AND LIGHTING PURPOSES ONLY. EXAMINE ALL ENGINEERING DRAWINGS AND FIELD
<br />CONDITIONS FOR SPECIFIC LOCATIONS OF UTILITIES, STRUCTURES, ETC. AND NOTIFY THE LANDSCAPE ARCHITECT IN REFERENCE TO ANY
<br />DISCREPANCIES OR LOCATION CONFLICTS PRIOR TO PLANTING INSTALLATION.
<br />2. CONTRACTOR SHALL COORDINATE ALL PLANTING INSPECTIONS AND APPROVALS WITH APPLICABLE MUNICIPAL OFFICIALS.
<br />3. THE CONTRACTOR SHALL ENSURE THAT WORK DOES NOT INTERRUPT ESTABLISHED OR PROJECTED DRAINAGE PATTERNS.
<br />4. IN THE EVENT OF VARIATION BETWEEN WRITTEN QUANTITIES AND QUANTITIES SHOWN ON THE PLAN, THE PLANS SHALL TAKE
<br />PRECEDENCE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PLANT QUANTITIES PRIOR TO THE COMMENCEMENT OF WORK.
<br />SOD AND SEED QUANTITY TAKE-OFFS ARE THE RESPONSIBILITY OF THE CONTRACTOR. ALL DISCREPANCIES SHALL BE REPORTED TO THE
<br />LANDSCAPE ARCHITECT OR ENGINEER FOR CLARIFICATION PRIOR TO BIDDING. THE CONTRACTOR SHALL FURNISH PLANT MATERIAL IN
<br />SIZES AS SPECIFIED IN PLANT LIST.
<br />5. PLANTS SHALL BE LOCATED AS SHOWN ON THE DRAWINGS OR AS DESIGNATED IN THE FIELD.
<br />6. ALL PLANT MATERIAL SHALL CONFORM TO CURRENT "AMERICAN STANDARDS FOR NURSERY STOCK" BY AMERICAN NURSERY & LANDSCAPE
<br />ASSOCIATION (ANLA). TREES SHALL BE NURSERY-GROWN, FREE OF DISEASE, SUBSTANTIALLY UNIFORM IN SIZE AND SHAPE AND HAVE
<br />STRAIGHT TRUNKS.
<br />7. ALL PLANTS (B&B OR CONTAINER) SHALL BE PROPERLY IDENTIFIED BY WEATHERPROOF LABELS SECURELY ATTACHED THERETO BEFORE
<br />DELIVERY TO PROJECT SITE. LABELS SHALL IDENTIFY PLANTS BY SPECIES AND SIZE. LABELS SHALL NOT BE REMOVED UNTIL THE FINAL
<br />INSPECTION BY THE LANDSCAPE ARCHITECT OR ENGINEER.
<br />8. ANY MATERIAL AND/OR WORK MAY BE REJECTED BY THE LANDSCAPE ARCHITECT OR ENGINEER IF IT DOES NOT MEET THE REQUIREMENTS
<br />OF THE SPECIFICATIONS. ALL REJECTED MATERIALS SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR.
<br />PLANT SUBSTITUTIONS SHALL BE PERMITTED ONLY WITH WRITTEN CONSENT OF THE OWNER OR LANDSCAPE ARCHITECT RELATIVE TO
<br />SIZE, SPECIES AND VARIETY. ALL PLANT MATERIAL SHALL BE TO TRUE SPECIES, VARIETY, AND SIZE AND BE CERTIFIED DISEASE AND
<br />INSECT FREE. WRITTEN PROOF OF UNAVAILABLE PLANT MATERIAL MUST BE DOCUMENTED.
<br />10. ALL PROPOSED TREES TO BE INSTALLED EITHER ENTIRELY IN OR ENTIRELY OUT OF PLANTING BEDS. PLANTING BED LINES ARE NOT TO BE
<br />OBSTRUCTED. ALL SHRUBS AND GROUND COVER AREAS SHALL BE PLANTED IN CONTINUOUS PREPARED BED AND TOP DRESSED WITH A 3
<br />INCH LAYER OF SHREDDED HARDWOOD MULCH. MULCH SHALL HAVE BEEN SHREDDED WITHIN THE LAST SIX MONTHS.
<br />11. TRANSPLANTING:
<br />A. PLANTS SHALL NOT BE DUG FOR TRANSPLANTING BETWEEN APRIL 10 AND JUNE 30.
<br />B. ALL TRANSPLANTS SHALL BE DUG WITH INTACT ROOT BALLS CAPABLE OF SUSTAINING THE PLANT.
<br />C. IF PLANTS ARE TO BE STOCKPILED BEFORE REPLANTING, THEY SHALL BE HEALED IN WITH MULCH OR SOIL, ADEQUATELY WATERED
<br />AND PROTECTED FROM EXTREME HEAT, SUN AND WIND.
<br />D. UPON REPLANTING, BACKFILL SOIL SHALL BE AMENDED WITH FERTILIZER AND ROOT GROWTH HORMONE.
<br />E. TRANSPLANTS SHALL BE GUARANTEED FOR THE LENGTH OF THE GUARANTEE PERIOD SPECIFIED HEREIN.
<br />F. IF TRANSPLANTS DIE, SHRUBS LESS THAN SIX INCHES (6") DBH SHALL BE REPLACED IN KIND.
<br />12. BULBS SHALL BE PLANTED IN ACCORDANCE WITH SECTION 11 OF THE ANLA STANDARDS.
<br />13. THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR STABILITY AND CONDITIONS OF ALL TREES AND SHRUBS AND SHALL BE LEGALLY
<br />LIABLE FOR ANY DAMAGE CAUSED BY INSTABILITY OF ANY PLANT MATERIALS. STAKING OF ALL TREES SHALL BE DONE AS INDICATED ON
<br />THE DOCUMENTS.
<br />14. ALL TREE STAKES AND WIRES WILL BE REMOVED BY THE APPLICANT AFTER ONE (1) YEAR FROM THE DATE OF INSTALLATION.
<br />15. VEGETATION PROPOSED AMONG EXISTING VEGETATION IS TO BE PLANTED TO AVOID DAMAGE TO THE EXISTING VEGETATION.
<br />16. ALL STREET TREES AND SHADE TREES PLANTED NEAR PEDESTRIAN OR VEHICULAR ACCESS SHOULD NOT BE BRANCHED LOWER THAN 7'
<br />ABOVE GRADE.
<br />17. MAINTAIN POSITIVE DRAINAGE OUT OF PLANTING BEDS AT A MINIMUM 2% SLOPE. ALL GRADES, DIMENSIONS AND EXISTING CONDITIONS
<br />SHALL BE VERIFIED BY THE CONTRACTOR ON SITE BEFORE CONSTRUCTION BEGINS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE
<br />ATTENTION OF THE LANDSCAPE ARCHITECT, ENGINEER, OR OWNER.
<br />18. ALL PLANTING BEDS SHALL RECEIVE 3 INCHES OF SHREDDED HARDWOOD MULCH WITH WEED INHIBITING FABRIC BENEATH.
<br />19. PLANT MATERIALS SHALL NOT BE INSTALLED UNTIL FINISHED GRADING HAS BEEN COMPLETED.
<br />20. UPON COMPLETION OF ALL LANDSCAPING, AN ACCEPTANCE MEETING OF THE WORK SHALL BE HELD. THE CONTRACTOR SHALL NOTIFY THE
<br />LANDSCAPE ARCHITECT OR ENGINEER OR OWNER FOR SCHEDULING THE INSPECTION AT LEAST SEVEN (7) DAYS PRIOR TO THE
<br />ANTICIPATED INSPECTION DATE.
<br />21. ALL TREES SHALL BE GUARANTEED FOR 24 MONTHS FROM TO DATE OF ACCEPTANCE. ALL SHRUBS AND GROUND COVERS SHALL BE
<br />GUARANTEED FOR 24 MONTHS FROM THE DATE OF ACCEPTANCE. REPLACEMENT PLANTS USED SHALL BE GUARANTEED FOR AN
<br />ADDITIONAL 90 DAYS.
<br />22. PLANTING DATES:
<br />FALL
<br />AUGUST 15 - DECEMBER 15: EVERGREEN TREES
<br />OCTOBER 15 - DECEMBER 15: DECIDUOUS TREES
<br />SPRING
<br />MARCH 1 - MAY 15:ALL PLANTS
<br />LAWN:
<br />23. ALL DISTURBED AREA OF THE SITE NOT PLANTED WITH SHRUBS OR GROUND COVER SHALL BE FINE GRADED AND SEEDED OR SODDED.
<br />24. ALL SOD SHALL BE OBTAINED FROM AREAS HAVING GROWING CONDITIONS FAMILIAR TO AREAS TO BE COVERED. AREAS TO BE SODDED
<br />SHALL BE RAKED OF STONES AND DEBRIS. DEBRIS AND STONES OVER 1 INCH IN DIAMETER SHALL BE REMOVED FROM THE SITE. ALL
<br />DAMAGED SOD WILL BE REJECTED. ALL SOD MUST BE PLACED WITH STAGGERED JOINTS, BUTTED WITH NO INEQUALITIES IN GRADE.
<br />PLACE ALL SOD IN ROWS AT RIGHT ANGLES TO SLOPES (WHERE APPLICABLE).
<br />25. ALL PLANTING BEDS ADJACENT TO LAWN AREAS (SOD OR SEEDED) SHALL BE SPADE EDGED.
<br />SOILS:
<br />26. CONTRACTOR SHALL PROVIDE A CERTIFIED SOIL TEST OF EXISTING ON SITE SOILS TO BE USED AS PART OF PLANTING BACKFILL MIXTURE.
<br />27. PLANT BACKFILL MIXTURE: BACKFILL PLANT PITS WITH A MIXTURE OF TOPSOIL AND SOIL AMENDMENTS. AMENDMENTS SHALL BE ADDED
<br />AS RECOMMENDED BY CERTIFIED SOIL TEST.
<br />28. CONTRACTOR SHALL PROVIDE PLANTING BACKFILL MIXTURE TO PROPOSED DEPTHS AS FOLLOWS: TREES (24 INCH MINIMUM OF PLANTING
<br />BACKFILL MIXTURE), SHRUBS (18 INCH MINIMUM OF PLANTING BACKFILL MIXTURE), PERENNIALS AND GROUNDCOVER (12 INCH MINIMUM OF
<br />PLANTING BACKFILL MIXTURE).
<br />29. IF WET SOIL CONDITIONS EXIST THEN PLANT PITS SHALL BE EXCAVATED AN ADDITIONAL 12" AND THE ADDITIONAL AREA FILLED WITH SAND.
<br />30. IMPORTED OR ON-SITE TOPSOIL MAY BE USED TO REFILL THE EXCAVATED AREA. TOPSOIL FROM THE SITE MAY BE REJECTED IF IT HAS NOT
<br />BEEN PROPERLY REMOVED, STORED AND PROTECTED PRIOR TO CONSTRUCTION. CONTRACTOR SHALL FURNISH TO THE APPROVING
<br />AGENCY AN ANALYSIS OF BOTH IMPORTED AND ON-SITE TOPSOIL TO BE UTILIZED IN ALL PLANTING AREAS. CONTRACTOR TO MODIFY THE
<br />SOIL AS NEEDED TO MEET REQUIRED PH AND NUTRIENT LEVELS.
<br />31. LAWN/LANDSCAPE RESTORATION AREAS: CONTRACTOR TO COMPLETELY REMOVE ALL UNDERLYING CONSTRUCTION MATERIALS AND
<br />SCARIFY/RIP REMAINING SOIL TO A DEPTH OF 24", INCLUDING A MINIMUM OF 6" THICK TOPSOIL.
<br />32. ALL AREAS, WHICH ARE TO BE SEEDED, SHALL RECEIVE 5" OF TOPSOIL PRIOR TO SEEDING. PRIOR TO TOPSOIL PLACEMENT THE EXISTING
<br />SOIL SHALL BE RAKED CLEAN OF WEEDS, VEGETATION AND EXTRANEOUS MATERIALS SUCH AS WOOD, STONES, ROCKS, CONSTRUCTION
<br />DEBRIS, ETC. LARGER THAN TWO (2) INCHES IN ANY DIMENSION. TOPSOIL SHALL BE SANDY LOAM FREE FROM SUBSOIL, STONES LARGER
<br />THAN 1", OR ANY UNDESIRABLE MATERIAL: CONTAIN 5% ORGANIC MATTER, 6.0 TO 6.5 PH. TOPSOIL SHALL NOT BE WORKED IN MUDDY OR
<br />WET CONDITIONS.
<br />33. TOPSOIL AND SEED ALL AREAS DISTURBED AS A RESULT OF ANY AND ALL CONSTRUCTION DISTURBANCES AND STORAGE OF EQUIPMENT,
<br />WHETHER SUCH AREAS ARE SHOWN ON THE PLANS OR NOT. CONTRACTOR TO FIELD VERIFY AREAS OF SEED AND SOD PRIOR TO
<br />SUBMITTING A BID.
<br />34. THE CONTRACTOR IS RESPONSIBLE FOR TESTING PROJECT SOILS. THE CONTRACTOR IS TO PROVIDE A CERTIFIED SOILS REPORT TO THE
<br />OWNER. THE CONTRACTOR SHALL VERIFY THAT THE SOILS ON SITE ARE ACCEPTABLE FOR THE PROPER GROWTH OF THE PROPOSED
<br />PLANT MATERIAL. SHOULD THE CONTRACTOR FIND POOR SOIL CONDITIONS, THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE SOIL
<br />AMENDMENTS AS NECESSARY. THE AMENDMENTS SHALL INCLUDE, BUT NOT BE LIMITED TO, FERTILIZERS, LIME, AND TOPSOIL. PROPER
<br />PLANTING SOILS MUST BE VERIFIED PRIOR TO PLANTING OF MATERIALS.
<br />35. ALL PLANTING AREAS WITHIN EXISTING ASPHALT PAVEMENT AREAS SHALL BE DECOMPACTED A MINIMUM DEPTH OF 24 INCHES.
<br />CONTRACTOR TO REMOVE ASPHALT/BASE MATERIALS AND SCARIFY/RIP REMAINING SOIL TO A DEPTH OF 24". TAKE CARE TO NOT RIP SOIL
<br />WITHIN THE DRIP LINE OF EXISTING TREES.
<br />36. ALL PROPOSED SLOPES GREATER THAT 3:1 SLOPE SHALL BE STABILIZED WITH COIR FIBER 700 MATTING (AS SUPPLIED BY PINELANDS
<br />NURSERY) AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
<br />COORDINATION:
<br />37. THE CONTRACTOR SHALL COORDINATE WITH LIGHTING CONTRACTOR (WHEN / WHERE APPLICABLE) REGARDING TIMING OF INSTALLATION
<br />OF PLANT MATERIAL.
<br />38. THE CONTRACTOR SHALL VERIFY THE EXISTENCE OF UNDERGROUND UTILITIES ON THE SITE THREE (3) DAYS PRIOR TO ANY EXCAVATION.
<br />THEIR EXACT LOCATION SHALL BE VERIFIED IN THE FIELD WITH THE OWNER OR GENERAL CONTRACTOR PRIOR TO THE COMMENCEMENT
<br />OF ANY DIGGING OPERATIONS. IN THE EVENT UTILITIES ARE UNCOVERED, THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL
<br />DAMAGE TO THE UTILITIES AND SUCH DAMAGE SHALL NOT RESULT IN ANY ADDITIONAL EXPENSES TO THE OWNER. ANY DAMAGE OF
<br />UNREPORTED LINES SHALL NOT BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />39. IF UTILITY LINES ARE ENCOUNTERED IN EXCAVATION OF TREE PITS, OTHER LOCATIONS FOR TREES SHALL BE MADE BY THE CONTRACTOR
<br />WITHOUT ADDITIONAL COMPENSATION. NO CHANGES OF LOCATION SHALL BE MADE WITHOUT APPROVAL OF THE LANDSCAPE ARCHITECT
<br />OR ENGINEER.
<br />INSTALLATION:
<br />40. ALL EQUIPMENT AND TOOLS SHALL BE PLACED SO AS NOT TO INTERFERE OR HINDER THE PEDESTRIAN AND VEHICULAR TRAFFIC FLOW.
<br />41. DURING PLANTING OPERATIONS EXCESS WASTE MATERIALS SHALL BE PROMPTLY AND FREQUENTLY REMOVED FROM THE SITE.
<br />42. EVERY POSSIBLE SAFEGUARD SHALL BE TAKEN TO PROTECT BUILDING SURFACES, EQUIPMENT, AND FURNISHING. THE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR ANY DAMAGE OR INJURY TO PERSON OR PROPERTY WHICH MAY OCCUR AS A RESULT OF HIS NEGLIGENCE IN
<br />THE EXECUTION OF THE WORK.
<br />MAINTENANCE:
<br />43. MAINTENANCE SHALL BEGIN AFTER EACH PLANT HAS BEEN INSTALLED AND SHALL CONTINUE UNTIL 90 DAYS AFTER FINAL ACCEPTANCE BY
<br />THE LANDSCAPE ARCHITECT OR OWNER REPRESENTATIVE. MAINTENANCE INCLUDES: WATERING. PRUNING, FERTILIZING, WEEDING,
<br />MULCHING, REPLACEMENT OF DISEASED OR DEAD PLANTS, AND ANY OTHER CARE NECESSARY FOR THE PROPER GROWTH OF THE PLANT
<br />MATERIAL. THE CONTRACTOR MUST BE ABLE TO PROVIDE CONTINUED MAINTENANCE IF REQUESTED BY THE OWNER. NEWLY INSTALLED
<br />PLANT MATERIAL SHALL BE WATERED AT THE TIME OF INSTALLATION. REGULAR WATERING SHALL BE PROVIDED TO ENSURE THE
<br />ESTABLISHMENT, GROWTH AND SURVIVAL OF PLANTS.EQ.EQ.PLAN 6" MIN.GROUNDCOVER PLANTS SHALL
<br />BE TRIANGULARLY SPACED
<br />MULCH
<br />PAVEMENT
<br />PERENNIAL/GROUNDCOVER PLANTING
<br />N.T.S.
<br />SECTION
<br />2" HARDWOOD MULCH
<br />UNDISTURBED SUBGRADE
<br />PLANT BACKFILL MIXTURE
<br />SEE GENERAL LANDSCAPE
<br />NOTES12" MIN.DECIDUOUS TREE PLANTING
<br />N.T.S.
<br />12" MIN
<br />NOTES:
<br />1.AT PLANTING, PRUNE ONLY CROSSING LIMBS, CO-DOMINANT LEADERS, BROKEN OR DEAD
<br />BRANCHES WHILE MAINTAINING NORMAL TREE SHAPE.
<br />2. WATER THOROUGHLY TWICE WITHIN THE FIRST 48 HOURS.
<br />3.TOP OF ROOTBALL SHALL BE SET FLUSH TO GRADE. TRUNK FLARE SHALL BE VISIBLE AT TOP OF
<br />ROOTBALL. DO NOT COVER TOP OF ROOT BALL WITH SOIL.
<br />4.IF/WHEN INSTALLED, ALL TREE STAKING SHALL BE REMOVED AFTER ONE YEAR.
<br />5.ALL TREE STAKING SHALL BE INSTALLED ONLY IF REQUIRED BY LOCAL MUNICIPAL REQUIREMENTS.
<br />2.5X ROOTBALL WIDTH
<br />12" MIN.
<br />STAKING PLAN
<br />N.T.S.
<br />SINGLE STRAIGHT TRUNK
<br />KEEP MULCH AWAY
<br />FROM ROOT COLLAR
<br />PLANT BACKFILL MIXTURE
<br />SEE GENERAL LANDSCAPE NOTES
<br />ROOTBALL ON UNDISTURBED
<br />OR COMPACTED SOIL
<br />CENTRAL LEADER SHALL NOT
<br />BE CUT OR DAMAGED
<br />TAMP SOIL AROUND ROOTBALL
<br />BASE FIRMLY TO SECURE
<br />FINISHED GRADE
<br />WRAP TREE WITH BREATHABLE
<br />FABRIC FROM TRUNK FLARE TO
<br />FIRST BRANCH AND SECURE WITH
<br />BIODEGRADABLE TAPE
<br />5/16" DIA. GALVANIZED
<br />TURNBUCKLE
<br />REINFORCED RUBBER HOSE
<br />( INSTALL TO ALLOW TREE TO SWAY)
<br />DOUBLE #10 GAUGE
<br />WIRE TWISTED
<br />2"x2"x6'-0" WOODEN STAKE.
<br />THREE (3) PER TREE FOR ALL
<br />TREES UNDER 3 1/2" CAL.
<br />(IF REQUIRED BY MUNICIPALITY)
<br />3" SHREDDED HARDWOOD
<br />MULCH PLACED
<br />THROUGHOUT PLANTING BED
<br />CUT & REMOVE BURLAP,
<br />TWINE, ROPE AND BASKET
<br />FROM TOP 1/3 OF BALL AND
<br />REMOVE FROM SITE(REMOVE
<br />ALL SYNTHETIC MATERIALS)
<br />3" SAUCER RIM
<br />UNDISTURBED
<br />SUB-GRADE
<br />PREVAILING
<br />WINDS
<br />REINFORCED
<br />RUBBER HOSE
<br />TREE
<br />TREE STAKES
<br />EVERGREEN TREE PLANTING
<br />N.T.S.
<br />12" MIN
<br />NOTES:
<br />1.WATER THOROUGHLY TWICE WITHIN THE FIRST 48 HOURS.
<br />2.TOP OF ROOTBALL SHALL BE SET FLUSH TO GRADE. TRUNK FLARE SHALL BE VISIBLE
<br />AT TOP OF ROOTBALL. DO NOT COVER TOP OF ROOT BALL WITH SOIL.
<br />4.IF/WHEN INSTALLED, ALL TREE STAKING SHALL BE REMOVED AFTER ONE YEAR.
<br />5.ALL TREE STAKING SHALL BE INSTALLED ONLY IF REQUIRED BY LOCAL MUNICIPAL
<br />REQUIREMENTS.
<br />2.5X ROOTBALL WIDTH
<br />12" MIN.
<br />STAKING PLAN
<br />N.T.S.
<br />KEEP MULCH AWAY
<br />FROM ROOT COLLAR
<br />PLANT BACKFILL MIXTURE
<br />SEE GENERAL LANDSCAPE NOTES
<br />ROOTBALL ON UNDISTURBED
<br />OR COMPACTED SOIL
<br />UNDISTURBED
<br />SUB-GRADE
<br />FINISHED GRADE
<br />5/16" DIA. GALVANIZED
<br />TURNBUCKLE
<br />REINFORCED
<br />RUBBER HOSE
<br />DOUBLE #10 GAUGE
<br />WIRE TWISTED
<br />3" SHREDDED HARDWOOD
<br />MULCH PLACED
<br />THROUGHOUT PLANTING BED
<br />CUT & REMOVE BURLAP,
<br />TWINE, ROPE AND BASKET
<br />FROM TOP 1/3 OF BALL AND
<br />REMOVE FROM SITE(REMOVE
<br />ALL SYNTHETIC MATERIALS)
<br />3" SAUCER RIM
<br />TAMP SOIL AROUND ROOTBALL
<br />BASE FIRMLY TO SECURE
<br />PREVAILING
<br />WINDS
<br />REINFORCED
<br />RUBBER HOSE
<br />TREE
<br />TREE STAKES
<br />2"x2"x6'-0" WOODEN STAKE.
<br />THREE (3) PER TREE FOR ALL
<br />TREES UNDER 3 1/2" CAL.
<br />(IF REQUIRED BY MUNICIPALITY)
<br />BEDLINE
<br />N.T.S.
<br />LAWN
<br />(OR PAVEMENT)
<br />BEDLINE
<br />MULCH
<br />LAWN
<br />N.T.S.5" OR 8"SEEDED/SOD LAWN
<br />OR MEADOW
<br />TOPSOIL
<br />5" FOR LAWN
<br />8" LAYER FOR MEADOW
<br />UNDISTURBED
<br />SUB-GRADE
<br />SHRUB PLANTING
<br />N.T.S.
<br />ROOTBALL SHALL BE SET
<br />FLUSH TO FINAL GRADE
<br />3" SHREDDED
<br />HARDWOOD MULCH
<br />PLACED THROUGHOUT
<br />PLANTING BED
<br />CUT & REMOVE BURLAP,
<br />TWINE, ROPE AND BASKET
<br />FROM TOP 1/3 OF BALL AND
<br />REMOVE FROM SITE(REMOVE
<br />ALL SYNTHETIC MATERIALS)
<br />PLANT BACKFILL MIXTURE
<br />SEE GENERAL
<br />LANDSCAPE NOTES
<br />KEEP MULCH AWAY
<br />FROM ROOT COLLAR
<br />ROOTBALL ON UNDISTURBED
<br />OR COMPACTED SOIL
<br />TAMP SOIL AROUND
<br />ROOTBALL BASE FIRMLY
<br />TO SECURE
<br />SIDEWALK
<br />8" MIN.
<br />3" SAUCER RIM ON
<br />PERIMETER OF
<br />SHRUB GROUPS
<br />REMOVE PLASTIC
<br />CONTAINER
<br />NOTES:
<br />1. WATER THOROUGHLY TWICE WITHIN THE FIRST 48 HOURS.
<br />2. TOP OF ROOTBALL SHALL BE SET FLUSH TO GRADE. TRUNK FLARE SHALL BE VISIBLE AT TOP OF
<br />ROOTBALL. DO NOT COVER TOP OF ROOT BALL WITH SOIL.
<br />3. IF SHRUB IS IN LEAF APPLY WILT-PROOF, OR EQUAL AS PER MANUFACTURERS RECOMMENDATION.
<br />SOD SHALL BE LAID IN A
<br />STAGGERED MANNER. SOD
<br />STRIPS SHALL BE BUTT JOINTED
<br />TIGHTLY AGAINST ONE ANOTHER
<br />SOD INSTALLATION
<br />N.T.S.
<br />JOINT SPACES THAT ARE
<br />GREATER THAN ONE-HALF INCH
<br />(12") WILL NOT BE ACCEPTED
|