My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/26/2017 Environmental Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Minutes
>
2017
>
07/26/2017 Environmental Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:53:25 AM
Creation date
5/5/2022 10:50:34 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Minutes
Meeting Date
07/26/2017
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />APPROVED MINUTES <br /> <br /> <br />The propose development is an expansion of the All Season’s Rental Business to an <br />expanded adjacent area to the South. The owners Mr. Carlson and Mrs. Carlson are <br />asking for Preliminary Plat review, a rezone from R-X, (Rural Executive) to GB <br />(General Business). The project will need a conditional use permit, which will result <br />in a Commercial Planned Unit Development planning process, and a permit for <br />small engine repair. <br /> <br />The site is located at 7932 Lake Dr. It consists of 2.23-acre parcels/1.6 acres of <br />disturbed area. The existing and proposed impervious area is 0.73 acres and 1.4 <br />acres respectively. <br /> <br />Mr. Carlson has a concrete batch plant existing on the site. The owner will submit <br />plans for concrete devices to collect concrete mix spillage at the the beginning of the <br />process and concrete washout collection at the end of the process. <br /> <br />Mr. Carlson suggested that Mr. Asleson visited the site and discussed the concrete <br />wash out area. In addition, there will be more wash out bays. <br /> <br />Ms. Holmes wanted to know what happens at the concrete from the wash out area. <br /> <br />Mr. Carlson said that all the concrete could be recycled after the product has dried <br />out. In addition, the water can be reused in other batches of concrete. <br /> <br />Mr. Sullivan thought adding the small engine repair a good addition to the business. <br /> <br />Ms. Kaufenberg wanted to know if the irrigation system would include sensors. <br /> <br />Mr. Carlson yes there will be sensors. <br /> <br />Ms. Andrzejewski recommends forwarding the preliminary plat on to the Planning & <br />Zoning Board and the City Council. Mr. Sullivan seconded the motion. Motion <br />carried <br />4 -0. <br /> <br />B. Natural Resources Revolving Fund Plan, Alison Harwood of WSB & Associates. <br /> <br />Ms. Harwood presented the Natural Resources Revolving Fund Plan findings <br />highlighting the topics below <br /> <br /> Background <br /> Purpose & Goals <br /> Existing Bank Sites <br /> Site Selection Criteria <br /> Individual Site Review
The URL can be used to link to this page
Your browser does not support the video tag.