My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-09-1997 Charter Packet
LinoLakes
>
Charter Commission
>
Agenda Packets
>
1981 - 2021 Agenda Packets - Charter Commission
>
1997 Packets
>
01-09-1997 Charter Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 7:20:51 PM
Creation date
5/6/2022 11:25:42 AM
Metadata
Fields
Template:
Charter Commission
Meeting Date
01/09/1997
Charter Meeting Type
Regular
Charter Document Type
Packets
Retention Until
Permanent
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT OCT.10,96 ROAD IMPROVEMENT PROGRAM GUIDELINES <br /> BY DON DUNN AND KIRK KORSON <br /> THE LINO LAKES CHARTER COMMISSION SUPPORTS AND REQUESTS <br /> IMEDIATE GENERATION OF A CITY WIDE ROAD RECONSTRUCTION PROGRAM <br /> AND RECOMENDS THAT THE CITY COUNCIL ADOPT THE FOLLOWING <br /> GUIDELINES BY RESOLUTIONS. <br /> THE LINO LAKES CITY COUNCIL HEREBY RESOLVES TO ASSIGN THE <br /> ENGINEERING STAFF THE RESPONSIBILITY TO DEVELOPE AND IMPLEMENT A <br /> CITY WIDE ROAD RECONSTRUCTION PROGRAM.THE PURPOSE WILL BE TO <br /> EVALUATE THE ROAD CONDITIONS OF ALL THE CITY ROADS. THE MINNESOTA <br /> STATE AID ROADS WILL BE CATEGORIZED SEPERATELY.THE RESULTS OF TH8 <br /> EVALUATION WILL ASSIST IN DETERMINING THE PRIORITY OF COMMENCING <br /> STREET RECONSTRUCTION. <br /> IN ADDITION TO THE ROAD EVALUATION THE CITY ENGINEERING <br /> STAFF WILL DEVELOPS A RECONSTRUCTION FORMULA OF WHICH ROAD <br /> CONDITIONS WILL BE A FACTOR.THE FORMULA SHALL AT A MINIMUM CONSIDER <br /> THE FOLLOWING FACTORS. <br /> l.CONDITION ON THE ROADWAY <br /> 2.NUMBER OF CITIZENS THAT WILL BENEFIT FROM THE RECONSTRUCTION <br /> 3.TRAFIC FLOW AND SAFTYCONCERNS WITHIN THE RECONSTRUCTION AREA <br /> 4.COST EFFECTIVENESS OF THE RECONSTRUCTION <br /> 5.METHOD TO SYSTEMATICALLY ENSURE THE UPGRADE OF MUNICIPAL <br /> ROADS ON A CONTINUOUS BASIS. <br /> BE IT FURTHER RESOLVED THAT THE ROAD RECONSTRUCTION PROGRAM <br /> WILL BE AN AGENDA ITEM AT EACH COUNCIL WORK SESSION WITH AN <br /> OBJECTIVE TO IMPLEMENT THRU COUNCIL ACTION PHASE 1 OF THE <br /> RECONSTRUCTION PROGRAM NO LATER THAN SPRING OF 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.