My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-09-2022 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
05-09-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 5:53:38 PM
Creation date
5/9/2022 11:34:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/09/2022
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
assume the future pavement section will be 32-feet back-to-back. The analysis will be <br />based on Atlas 14 precipitation depths. We will evaluate options for routing the proposed <br />system based on the capacity of the existing stubs. <br />We will provide a draft layout of the proposed trunk storm sewer and preliminary sizing <br />of the trunk storm sewer for proposed conditions. <br />Deliverables: proposed drainage area map with trunk storm sewer layout, proposed <br />conditions H/H model, summary of discharge rates. <br />Task 5 — Identify BMP Locations/Footprints <br />The project area is located within RCWD. We will review the RCWD requirements and <br />identify what BMP requirements are needed due to the road reconstruction, increase in <br />impervious surfaces, and to mitigate any discharge rate increases. The City has <br />identified 3 potential parcels within Lakeview and the Sunrise Park for BMPs. It may not <br />be feasible to fully meet RCWD requirements given the depth of the new storm sewer <br />and small size of the parcels. If additional BMP locations need to be identified outside <br />the Lakeview Area limits; we will update this scope and fee. <br />Deliverables: Summary of BMP sizing requirements, potential BMP locations, footprints <br />and types. <br />Task 6 — Prepare Draft and Final Drainage Plans <br />We will prepare a draft report documenting tasks 1-5. We have not included preparation <br />of cost estimates with this analysis. We will submit the draft report for City review and <br />comments. <br />Task 7 — Meet with City Staff <br />We will attend 2 meetings with City Staff to present the draft report and to discuss <br />comments from Staff. <br />We have not included coordination with RCWD at this stage. <br />TOTAL ESTIMATED FEE <br />The scope of services outlined in this proposal will be billed hourly, based on our current <br />hourly rates. We are proposing to complete tasks 1-7 for a not -to -exceed fee of <br />$14,400.00. <br />TIME SCHEDULE <br />We propose to start the work for this project upon authorization. We plan to complete the <br />work by July 2022. <br />If you have any questions about this proposal, please feel free to call me at 612-990- <br />3576. <br />Sincerely, <br />\\metro-inet\linolakes\Shared\Community Development\Projects\Planning Studies\2022 Lakeview Area Drainage\Staff <br />Reports\20220509 CC SR Lakeview Drainage Proposal\4. 20220429 Lakeview Drainage Proposal.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.