My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-13-2006 Charter Packet
LinoLakes
>
Charter Commission
>
Agenda Packets
>
1981 - 2021 Agenda Packets - Charter Commission
>
2006 Packets
>
04-13-2006 Charter Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 7:23:10 PM
Creation date
5/13/2022 9:42:43 AM
Metadata
Fields
Template:
Charter Commission
Meeting Date
04/13/2006
Charter Meeting Type
Regular
Charter Document Type
Packets
Retention Until
Permanent
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l:l l Y k-M IN UIL W UKK SESSION FEBRUARY 8,2006 <br /> APPROVED <br /> 1 site. The Woods Edge development required these infrastructure improvements, which <br /> 2 are fully assessed to Hartford Group, thus relieving the city of that obligation. <br /> 3 <br /> 4 Community Development Director Grochala advised the YMCA has spent years <br /> 5 fundraising in the community, and has approximately$6.3 million available for <br /> 6 construction. However, construction costs have risen considerably since 1999. A <br /> 7 community capital campaign is underway to attempt to raise an additional $800,000 <br /> 8 needed to build the full sized gym. While continuing to try to raise funds, the Y board <br /> 9 concluded the first phase needs to be in the ground this year, and submitted for approval <br /> 10 what could be built with$6.3 million. This facility includes a half-sized gym, and the <br /> 11 leisure pool and multi-purpose room were omitted,while recognizing these facilities <br /> 12 could be added in the future. The exterior fagade of the facility also falls short of the <br /> 13 architectural and materials standards set for the Woods Edge downtown development. <br /> 14 <br /> 15 Community Development Director Grochala continued indicating City Council members <br /> 16 have expressed their concern with the size of the first phase of the YMCA facility, the <br /> 17 lack of a leisure pool which is attractive to the young family demographic in Lino Lakes, <br /> 18 and the lack of architectural appeal of the facility. <br /> 19 <br /> 20 Community Development Director Grochala stated staff has discussed with the YMCA, <br /> 21 Springsted, and Kennedy& Graven options that might be available to provide the size <br /> 22 and type of facility that City Council and the community had anticipated. It is estimated <br /> 23 that currently$1,850,000 is needed to do the building that was approved,with the <br /> 24 addition of the leisure pool. <br /> 25 <br /> 26 Community Development Director Grochala explained the following alternative funding <br /> 27 scenario that provides $1,850,000 to build the leisure pool in the first phase,plus <br /> 28 additional upgrades to the fagade of the building. <br /> 29 <br /> 30 1. Part of the 2005 updated agreement called for a 5-year, 10 percent discount to <br /> 31 Lino Lakes residents on their monthly membership fees at the YMCA. While this <br /> 32 is a considerable benefit to residents who join the Y,it restricts the ability of the <br /> 33 YMCA to take on more debt, and benefits only residents who become members. If <br /> 34 that portion of the agreement were eliminated, it would enable the YMCA to take <br /> 35 on an additional $1 million in debt. <br /> 36 <br /> 37 2. Springsted updated its analysis of the capacity of the Tax Abatement District, <br /> 38 based on assumptions of anticipated values and phasing of the southern portion of <br /> 39 Woods Edge. A 15-year abatement will generate $2,406,845. <br /> 40 <br /> 41 3. The city is currently committed to 15-years of abatement for its $1.5 million <br /> 42 contribution. There is capacity available to provide the additional$850,000 to <br /> 43 meet the current gap in funding. This potential additional contribution would be <br /> 44 capped at $850,000. Any additional funds raised by the YMCA would lower the <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.