Laserfiche WebLink
7 <br /> <br />Comprehensive Plan Resource Management System <br />The Resource Management System Plan goal of preserving surface water quality is supported by the construction of stormwater management BMP’s such as curb, gutter and NURP pond. Land Use Plan <br />The Comprehensive Plan guides this property for industrial use. The proposed building addition to the Otter Lake Animal Care Center is consistent with industrial land use. Housing Plan <br />The goals and policies of Housing Plan are not negatively impacted by the proposed building addition to the Otter Lake Animal Care Center. Transportation Plan <br />Goals of the Transportation Plan are to ensure that street and roads are as safe as possible and to reduce unnecessary traffic. CR 84 (Otter Lake Road) is a Major Collector Road and is capable of handling the additional traffic volume proposed by the building addition. Sanitary Sewer and Water Supply Plan <br /> A 21” sanitary sewer main and 16” watermain along Otter Lake Road provide public utilities to the site. The sanitary sewer and water supply system have capacity for the building addition. Alternative Urban Areawide Review (AUAR) The site is within the 2005 I-35E Corridor AUAR environmental review boundary. The AUAR was updated in April 2020. The AUAR identified this site as industrial in all 3 land use scenarios. The proposed building addition to Otter Lake Animal Care Center is consistent with industrial development. No further environmental assessment is required. <br /> Wetlands A Wetland Delineation Report was prepared by Jacobson Environmental PLLC dated <br />November 12, 2018. A WCA Notice of Decision for the wetland delineation was issued by <br />RCWD on May 6, 2019 and is valid for 5 years. The wetland delineation report noted 2 basins on site. Per RCWD, the north basin (0.152 acres) was found to be incidental under WCA and is not a wetland. This basin is used for stormwater management. The south basin (0.080 acres) is a wetland, but no impacts are proposed. <br /> <br />The wetland is not in the Wetland Management Corridor; therefore, no conservation easement or buffer is required. A drainage and utility easement extending 10 feet from the delineated boundary will be required over the portion of the south wetland that is located on the subject site.