My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-13-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
06-13-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 6:03:02 PM
Creation date
6/13/2022 3:50:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/13/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />However, the city may, at its discretion, consider developer-financed improvements to <br />correct any street deficiencies; <br />7. The LOS requirements in divisions (2)(c)1. to 4. above do not apply to the I-35W/Lake <br />Drive or I-35E/Main St. interchanges. At city discretion, interchange impacts must be <br />evaluated in conjunction with Anoka County and the Minnesota Department of <br />Transportation, and a plan must be prepared to determine improvements needed to resolve <br />deficiencies. This plan must determine traffic generated by the subdivision project, how <br />this traffic contributes to the total traffic, and the time frame of the improvements. The plan <br />also must examine financing options, including project contribution and cost sharing <br />among other jurisdictions and other properties that contribute to traffic at the interchange; <br />and <br /> 8. The city does not relinquish any rights of local determination. <br /> <br />The Otter Crossing 2nd Addition preliminary plat meets the requirements for level of service <br />(LOS). The I-35E Corridor AUAR analyzed traffic impacts for commercial development of this <br />entire corridor. The proposed commercial car wash is consistent with the AUAR Land Use <br />Scenarios for commercial development. Otter Lake Road and CSAH 14 (Main Street) are A- <br />Minor Arterial Expander and A-Minor Arterial Connector roads, respectively and have <br />structural capacity to handle the traffic volume of the commercial car wash. No street <br />improvements are proposed that are inconsistent with the City’s capital improvement plan. The <br />city does not relinquish any rights of local determination. <br /> <br />(d) Water supply. A proposed subdivision shall be deemed to have an adequate water <br />supply when: <br />1. The city water system has adequate wells, storage or pipe capacity to serve the <br />subdivision; <br />2. The water utility extension is consistent with the Lino Lakes water plan and offers the <br />opportunity for water main looping to serve the urban subdivision; <br />3. The extension of water mains will provide adequate water pressure for personal use and <br />fire protection; and <br />4. The rural subdivision can demonstrate that each of the proposed lots can be provided <br />with a potable water supply. <br /> <br />The Otter Crossing 2nd Addition preliminary plat will have an adequate water supply. An 8” <br />watermain along the private street extending from Otter Lake Road will serve the development. <br />The City’s water system has capacity to accommodate the commercial car wash. <br /> <br />(e) Waste disposal systems. A proposed subdivision shall be served with adequate waste <br />disposal systems when: <br />1. The urban sewered subdivision is located inside the city's MUSA or is consistent with <br />the MUSA allocation criteria; <br />2. The city has sufficient MUSA and pipe capacity to serve the subdivision if developed <br />to its maximum density; <br />3. The subdivision will result in a sewer extension consistent with Lino Lakes sewer plan <br />and capital improvement plan; <br />4. A rural subdivision can demonstrate that each lot can be served by an adequate sanitary <br />sewer disposal system; and <br />5. A rural subdivision with a proposed communal sanitary sewer or water system has an <br />effective long range management and maintenance program with proper financing.
The URL can be used to link to this page
Your browser does not support the video tag.