My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-13-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
06-13-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 6:03:02 PM
Creation date
6/13/2022 3:50:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/13/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tidal Wave Auto Spa Site Performance Agreement page 2 of 10 <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-Site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br />1. Lighting $ 2,929.63 <br />2. Fences / Screen Structures $ 0.00 <br />3. Trash Disposal Structures $ 20,000.00 <br />4. Curbing / Islands / Delineators $ 23,647.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins $ 42,810.00 <br />6. Public Trails and / or Sidewalk $ 0.00 <br />7. Private Trials and / or Sidewalk $ 2,924.00 <br />8. Driveway / Parking Lot $ 279,275.75 <br />9. Water mains / Hydrants / Sanitary Sewers $ 42,483.00 <br />10. Landscaping $ 47,685.00 <br />11. Site Grading $ 11,685.00 <br />12. Erosion Control $ 6,5000.00 <br /> Total Estimated Cost of Developer Improvements $ 479,939.38 <br /> Security Requirement (Total * 35%) $ 167,978.80 <br /> <br /> <br />III. DEVELOPER FEES. <br /> <br />A. Trunk Sanitary Sewer Connection Fees <br />The City established trunk utility connection fees to uniformly distribute <br />the costs of public trunk sanitary sewer infrastructure. The Trunk Utility <br />Connection Fee consists of two components; a Trunk Charge and an <br />Availability Charge. <br /> <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the <br />time of hook-up, whichever is first. The Sanitary Sewer Trunk Charge is
The URL can be used to link to this page
Your browser does not support the video tag.