My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-13-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
06-13-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 6:03:02 PM
Creation date
6/13/2022 3:50:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/13/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVEL 01 <br />100' - 0" <br />MEZZANINE <br />112' - 0" <br />HEADER <br />107' - 6" <br />T.O. TREATMENT SILL <br />103' - 6" <br />C48 <br />C49 <br />C61 <br />C57 <br />C50 <br />C51 <br />C54 <br />C52 <br />C65 <br />C64 <br />C68 <br />W6 W6 <br />C69 <br />LEVEL 01 <br />100' - 0" <br />ROOF PEAK <br />127' - 11" <br />MEZZANINE <br />112' - 0" <br />HEADER <br />107' - 6" <br />T.O. SILL <br />102' - 8" <br />MEZZ HEADER <br />115' - 0" <br />CLERESTORY <br />118' - 6" <br />CLERESTORY HEADER <br />121' - 6" <br />VESTIBULE HEADER <br />118' - 0" <br />C51 <br />C53 <br />C62 <br />C68 <br />C63 <br />C64 <br />C67 <br />C62 <br />C50 <br />C57 <br />W10 W10 W10 W10 <br />EX EX EX EX EX <br />W2 <br />W2 <br />FBR FACEBRICK <br />MFR: ENDICOTT CLAY PRODUCTS <br />PROD: MANGANESE IRONSPOT VELOUR <br />MODULAR <br />CONTACT:METRO BRICK INC. 952-417-0200 <br />STN1 STONE <br />NOTES: MATCH EXISTING STONE ON <br />FRONT ELEVATION <br />LEGEND - EXTERIOR FINISH <br />SD1 SIDING <br />MFR: JAMESHARDIE <br />PROD: HARDIE PLANK LAP SIDING <br />COLOR: ARCTIC WHITE <br />NOTES: STATEMENT COLLECTION <br />TR1 TRIM <br />MFR: JAMESHARDIE <br />PROD: HARDIE TRIM <br />COLOR: LIGHT MIST <br />NOTES: STATEMENT COLLECTION <br />SD2 SIDING <br />MFR: JAMESHARDIE <br />PROD: HARDIE PLANK LAP SIDING <br />COLOR: EVENING BLUE <br />NOTES: STATEMENT COLLECTION <br />AL1 ALUMINUM STOREFRONT <br />MFR: KAWNEER <br />PROD: T451 <br />COLOR: CLEAR ANODIZED <br />WT1 STONE WATERTABLE <br />MFR: CUSTOM CAST STONE <br />PROD: BNDCH-42 <br />COLOR: NATURAL <br />RF1 ROOFING <br />MFR: MBCI <br />PROD: SUPERLOCK CONCEALED <br />FASTENER STANDING SEAM METAL <br />ROOFING <br />COLOR: CHARCOAL GRAY <br />SIZE: 16" <br />LF1 LIGHT FIXTURE <br />MFR: ET2 ALUMILUX LINE <br />PROD: E41343 <br />COLOR: DARK BRONZE <br />PT1 PAINT <br />MFR: SHERWIN WILLIAMS <br />COLOR: TO MATCH FASCIA COLOR <br />RF1 ROOFING <br />MFR: MBCI <br />PROD: SUPERLOCK CONCEALED <br />FASTENER STANDING SEAM METAL <br />ROOFING <br />COLOR: CHARCOAL GRAY <br />SIZE: 16" <br />PT2 PAINT <br />MFR: SHERWIN WILLIAMS <br />COLOR: PAINT TO MATCH SD1 <br />3/16" = 1'-0" <br />EXTERIOR ELEVATION - EAST1 <br />3/16" = 1'-0" <br />EXTERIOR ELEVATION - SOUTH2 <br />Ryan Schroeder <br />NO. Print History Date <br />#50047 <br />Signature : <br />Name : <br />Registration : <br />Project <br />Checked <br />Drawn <br />Project Contact : <br />Phone Number :952-541-9969 <br />I hereby certify that this plan was prepared <br />by me or under my direct supervision and <br />that I am a duly licensed architect under the <br />laws of the State of Minnesota. <br />Ryan Schroeder <br />21303 <br />LAM <br />RAS <br />OTTER LAKE ANIMAL <br />CARE CENTER <br />EXTERIOR <br />ELEVATIONS <br />A6.01 <br />OTTER LAKE <br />ANIMAL CARE <br />CENTER <br />6848 OTTER LAKE RD, <br />HUGO, MN 55038 <br />PLAN NOTES <br />NO.DESCRIPTION <br />C48 NEW CRICKET ROOF STRUCTURE TO BE WOOD STRUCTURAL TRUSSES W/ 5/8" <br />O.S.B. SHEATHING.- SEE STRUCTURAL <br />C49 STANDING SEAM ROOF W/ ROOFING FELTS & SLIP SHEET, MFR: TBD, PRODUCT: <br />TBD, TO BE INSTALLED OVER ROOF STRUCTURE. <br />C50 PRE-FINISHED 6" CONTINUOUS HORIZONTAL LAP SIDING, SD1 <br />C51 PRE-FINISHED 6" CONTINUOUS HORIZONTAL LHP SIDING, <br />C52 FACE BRICK <br />C53 STONE TO MATCH EXISTING <br />C54 NEW PRECAST SILL <br />C57 PRE-FINISHED METAL FASCIA & DRIP, PAINTED TO MATCH ROOF <br />C61 4" H PRE-FINISHED SNOW/ICE SHIELD TO RUN ENTIRE LENGTH OF ROOF. COLOR <br />TO MATCH ROOF <br />C62 ANODIZED ALUMINUM DOORS / WINDOWS <br />C63 EXISTING WINDOW TO REMAIN. PREP AND PAINT <br />C65 EXISTING HOLLOW METAL DOOR. PREP AND PAINT <br />C68 EXISTING METAL SIDING. PREP AND PAINT <br />C69 BELTLINE TRIM, TR1 <br />EAST ELEVATION MATERIALS <br />TOTAL SF OF EAST FACADE: 1,625 SF. <br />MATERIAL SF % OF FACADE <br />NEW CEMENT SIDING - DARK 266 16.4 <br />GLASS / DOORS 103 6.3 <br />BRICK / PRECAST SILLS 262 16.1 <br />NEW CEMENT SIDING - LIGHT 393 24.2 <br />EXISTING SIDING 601 37.0 <br />STONE 0 0 <br />SOUTH ELEVATION MATERIALS <br />TOTAL SF OF SOUTH FACADE: 1,395 SF. <br />MATERIAL SF % OF FACADE <br />NEW CEMENT SIDING - DARK 38 2.7 <br />GLASS / DOORS 153 11.0 <br />BRICK / PRECAST SILLS 0 0 <br />NEW CEMENT SIDING - LIGHT 371 26.6 <br />EXISTING SIDING 765 54.8 <br />STONE 68 4.9 <br />NO. Description Date <br />SITE PLAN REVIEW 03-24-22 <br />SITE PLAN REVIEW - UPDATE 04-11-22
The URL can be used to link to this page
Your browser does not support the video tag.