My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-13-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
06-13-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 6:03:02 PM
Creation date
6/13/2022 3:50:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/13/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Otter Lake Animal Care Center Site Performance Agreement page 4 of 10 <br />For residential properties, the availability charge shall be paid at the time <br />of subdivision approval or at the time of hook-up, whichever is first. <br />Commercial/Industrial/Institutional availability charges shall be paid at the <br />time of building permit. Fees are based on the number of sanitary access <br />charge (SAC) units assigned by Metropolitan Council Environmental <br />Services (MCES). <br /> <br />City Water (CWAC) $1,473.00 Per SAC Unit. <br /> <br />C. Surface Water Management Area Charges <br /> <br />The City established a trunk area charge to uniformly distribute the costs <br />of public trunk surface water infrastructure and water quality <br />improvements. The Surface Water Management Charge shall be based on <br />developable acreage. <br /> <br /> Unit Fee <br />1. Trunk Sanitary Sewer Fee ($1,573/unit; 2.92 units/Acre) Paid <br />2. <br />3. <br />Sanitary Lateral Service Connection Fee ($72.40/LF) <br />City Sewer Availability Fee ($1,525/SAC Unit) 4 <br /> Paid <br /> $ 6,100.00 <br />4. Trunk Water Fee ($2,341/unit; 2.92 units/Acre) 1.3*2.92 $ 8,886.44 <br />5. City Water Availability Fee ($1,473/SAC Unit) 4 $ 5,892.00 <br />6. <br />7. <br />Water Lateral Service Connection Fee ($68.50/LF) <br />City Surface Water Management Fee ($11,073/Acre) <br />203 lf <br />1.3 ac <br />$13,905.50 <br />$14,394.90 <br /> Total Developer Fees $49,178.84 <br /> <br />IV. RECORD DRAWINGS <br /> <br />a. Upon project completion, Developer shall submit record drawings, in <br />electronic format, of all public and private infrastructure improvements, <br />including grading, sanitary sewer, water main, storm sewer facilities, and roads, <br />constructed by Developer. The as-built survey must include, but is not limited <br />to, proposed and final contours with adequate elevation shots to show <br />conformance, property irons (to be exposed in field), low floor and low <br />opening elevations, and the 100-Year High Water Level (HWL) of all ponds, <br />lakes, and wetland areas. The files shall be drawn in Anoka County NAD 83 <br />Coordinate system and provided in both AutoCAD .dwg and Adobe .pdf file <br />formats. The plans shall include accurate locations, dimensions, elevations, <br />grades, slopes and all other pertinent information concerning the complete work. <br />b. No securities will be fully released until all record drawings have been <br />submitted and accepted by the City Engineer. <br />IV. COMPLETION DATE. <br /> <br />If the activities authorized by site and building plan approval are not initiated <br />within twelve (12) months from the final execution of this agreement, then
The URL can be used to link to this page
Your browser does not support the video tag.