Laserfiche WebLink
COUNCIL MINUTES <br /> APPROVED <br /> 77 - Site Location and Aerial Map; <br /> 78 - Preliminary Plat Review—Lot 1 and Lot 2 (Lot 1 is car wash—Lot 2 would be vacant); private <br /> 79 street extension is included; <br /> 80 - Site Plan for Car Wash—elements and revisions required; <br /> 81 - Architectural Review; <br /> 82 - Stormwater Management Review; <br /> 83 - Landscape Plan Review; <br /> 84 - Agency and Staff Comments—County (none); Public Safety (hydrant); Environmental Board <br /> 85 (reviewed); <br /> 86 - Agreements Required; <br /> 87 - Findings of Facts, as included in resolutions; <br /> 88 - Planning and Zoning Board—recommendation noted. <br /> 89 <br /> 90 Councilmember Stoesz asked if there is a snow storage plan. Ms. Larsen noted that there is no <br /> 91 dedicated site for snow storage but if there is not room they would have to remove it from the site. <br /> 92 <br /> 93 Councilmember Ruhland asked if there is any concern about additional vehicle back up. Ms. Larsen <br /> 94 explained ordinance requirements (12 spaces) and that staff did build into the CUP that waiting <br /> 95 vehicles cannot stage on nearby streets. <br /> 96 Mayor Rafferty noted the steel construction and concern about rust or erosion in this climate. Ms. <br /> 97 Larsen indicated how that possibility will be handled. <br /> 98 Councilmember Ruhland moved to approve Resolution No. 22-55, Resolution No. 22-56 and <br /> 99 Resolution No. 22-57 as presented. Councilmember Cavegn seconded the motion. Motion carried <br /> 100 on a voice vote. <br /> 101 6A) Consider Approval of Otter Lake Animal Care Center: i. Consider Resolution No. 22-58, <br /> 102 Approving Conditional Use Permit; ii. Consider Resolution No. 22-59 Approving Site <br /> 103 Improvement Performance Agreement—City Planner Larsen reviewed a PowerPoint presentation <br /> 104 that included information on the following: <br /> 105 - Land Use Application— Conditional use permit; <br /> 106 - Site Location Map; <br /> 107 - History of CUP (1986, 1996 and 2019); 2019 plans were not implemented within 1 year so <br /> 108 they have to reapply; <br /> 109 - Existing Site Conditions; <br /> 110 - Site Plan—proposed improvements; <br /> 111 - Exterior Materials; <br /> 112 - Stormwater Management; <br /> 113 - Landscape Plan; <br /> 114 - Comments—impervious surface, wetlands, floodplain (none), public safety; <br /> 3 <br />