Laserfiche WebLink
aALLIANT ENVIRONMENTAL ASSESSMENT WORKSHEET 11 Robinson Sod Farm <br />a. Project related generation/storage of solid wastes - Describe solid wastes generated/stored during <br />construction and/or operation of the project. Indicate method of disposal. Discuss potential <br />environmental effects from solid waste handling, storage and disposal. Identify measures to avoid, <br />minimize or mitigate adverse effects from the generation/storage of solid waste including source <br />reduction and recycling. <br />The proposed project is a residential subdivision. Waste material and debris associated with <br />construction will be contained on site and disposed of in a manner consistent with the City of Lino <br />Lakes Ordinances. Once constructed, the project should only generate municipal solid waste and <br />household hazardous waste. <br />The 2018 Anoka County Solid Waste Management Master Plan estimated each person generates 1.16 <br />tons of municipal solid waste annually. The following analysis provides a calculation based on the <br />range of units as established in the site plan: <br />PUD Concept Plan (557 Units): <br />Low, Medium, High 557 1.16 2.87 1,854 <br />Densitv Residential <br />Yield Plan (707 Units): <br />Low, Medium, High 707 1.16 2.87 2,354 <br />Density Residential <br />*Based on Met Council and 2020 Census <br />Residents will contract individually for solid waste management and recycling services through one of <br />the city's licensed haulers. Anoka County provides free recycling and disposal of hazardous wastes at <br />the Household Hazardous Waste Facility located in the nearby city of Blaine. <br />b. Project related use/storage of hazardous materials - Describe chemicals/hazardous materials <br />used/stored during construction and/or operation of the project including method of storage. Indicate <br />the number, location and size of any above or below ground tanks to store petroleum or other <br />materials. Discuss potential environmental effects from accidental spill or release of hazardous <br />materials. Identify measures to avoid, minimize or mitigate adverse effects from the use/storage of <br />chemicals/hazardous materials including source reduction and recycling. Include development of a <br />spill prevention plan. <br />During construction, the project will follow the NPDES permit requirements and city ordinances to <br />avoid and minimize effects from the use or storage of hazardous materials/chemicals. Refueling of <br />construction equipment will be in contained areas with drip pans. The contractor will be required to <br />clean up spills and report them immediately as required by Minnesota law/NPDES permit. The <br />contractor will also contain any washout operations (including concrete, paint, etc.) The containment <br />area will be posted with signs and inspected so that it does not generate any contaminated runoff. <br />PAGE 19 <br />