My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-01-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-01-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:05:31 PM
Creation date
8/3/2022 12:34:39 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/01/2022
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
831
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Custom Fire Apparatus, Inc. <br />or stress. The individual cores of the cooling system shall be mounted in a manner to allow expansion <br />and contraction at various rates without inducing stress into the adjoining cores. <br />The cooling system shall be comprised of a charge air cooler to radiator serial flow package that provides <br />the maximum cooling capacity for the specified engine as well as serviceability. The main components <br />shall include a surge tank, a charge air cooler bolted to the front of the radiator, recirculation shields, a <br />shroud, a fan, and required tubing. <br />The radiator shall be a down -flow design constructed with aluminum cores, plastic end tanks, and a steel <br />frame. The radiator shall be equipped with a drain cock to drain the coolant for serviceability. <br />The cooling system shall include a one piece injected molded polymer fan with a three (3) piece <br />fiberglass fan shroud. <br />The cooling system shall be equipped with a surge tank that is capable of removing entrained air from the <br />system. The surge tank shall be equipped with a low coolant probe and rearward oriented sight glass to <br />observe coolant in the system. A cold fill and observation line shall be included within the frame <br />mounted translucent recovery bottle to monitor the level of the coolant. The surge tank shall have a dual <br />seal cap that meets the engine manufacturer's pressure requirements and allows for expansion and <br />recovery of coolant into a separate integral expansion chamber. <br />All radiator tubes shall be formed from aluminized steel tubing. Recirculation shields shall be installed <br />where required to prevent heated air from reentering the cooling package and affecting performance. <br />The charge air cooler shall be a cross -flow design constructed completely of aluminum with cast tanks. <br />All charge air cooler tubes shall be formed from aluminized steel tubing and installed with silicone hump <br />hoses and stainless steel "constant torque" style clamps meeting the engine manufacturer's requirements. <br />The radiator and charge air cooler shall be removable through the bottom of the chassis. <br />ENGINE COOLING SYSTEM PROTECTION <br />The engine cooling system shall include a recirculation shield designed to act as a light duty skid plate <br />below the radiator to provide additional protection for the engine cooling system from light impacts, <br />stones, and road debris. The skid plate shall be painted to match the frame components. <br />ENGINE COOLANT <br />The cooling package shall include Extended Life Coolant (ELC). The use of ELC provides longer <br />intervals between coolant changes over standard coolants providing improved performance. The coolant <br />shall contain a 50150 mix of ethylene glycol and de -ionized water to keep the coolant from freezing to a <br />temperature of -34 degrees Fahrenheit. <br />Proposals offering supplemental coolant additives (SCA) shall not be considered, as this is part of the <br />extended life coolant makeup. <br />ENGINE COOLANT FILTER <br />07/26/22 <br />-18- <br />
The URL can be used to link to this page
Your browser does not support the video tag.