My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-01-2022 Council Work Session Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-01-2022 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:05:31 PM
Creation date
8/3/2022 12:34:39 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/01/2022
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
831
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Impact Study <br />Robinson Property <br />2.2.2 Roadway/Intersection Characteristics <br />Field observations were completed to identify roadway and intersection characteristics within the <br />study area (i.e., geometry, posted speed limits, and traffic controls), which are summarized in <br />Table 1 and Table 2. <br />Table 1— Roadway Characteristics <br />Roadway <br />Main Street <br />2-Lane Undivided <br />55 mph <br />Principal Arterial <br />Sunset Avenue <br />2-Lane Undivided <br />55 mph <br />Major Collector <br />4th Avenue <br />2-Lane Undivided <br />50 mph <br />Major Collector <br />Carl Street <br />2-Lane Undivided <br />30 mph <br />Local <br />Robinson Drive <br />2-Lane Undivided <br />30 mph <br />Minor Collector <br />Century Trail <br />2-Lane Undivided <br />30 mph <br />Minor Collector <br />mph = miles per hour <br />Table 2 — Intersection Characteristics <br />Intersection <br />Main Street & Sunset Avenue <br />Traffic Control <br />Through/Stop <br />Lane <br />LR <br />Designations <br />— <br />by Approach (1) <br />T/R LT (2) <br />Main Street & 4th Avenue <br />Through/Stop <br />LTR <br />LTR <br />LT/R <br />LT/R <br />4th Avenue & Carl Street <br />Through/Stop <br />LTR <br />LTR <br />LTR <br />LTR <br />Century Trail & Carl Street <br />Through/Stop <br />TR <br />LT <br />— <br />LR <br />Sunset Avenue & Century Trail <br />Through/Stop <br />T/R <br />LT <br />— <br />LR <br />Sunset Avenue & Robinson Drive <br />Through/Stop <br />T/R <br />LT <br />— <br />LR <br />Robinson Drive & Century Trail <br />Through/Stop <br />LTR <br />LTR <br />LTR <br />LTR <br />(1) L=Left-Turn, T=Through, R=Right-Turn <br />(2) Approach includes a left -turn bypass lane <br />The existing conditions, including the weekday a.m. and p.m. peak hour traffic volumes, are shown <br />in Figure 2. It should be noted that the following weekday peak hours were observed during the <br />data collection period: <br />• AM Peak Hour: 7:00 a.m. — 8:00 a.m. <br />• PM Peak Hour: 4:15 p.m. — 5:15 p.m. <br />2.2.3 Pedestrian/Bicycle Accommodations <br />Existing pedestrianibicycle accommodations within the study area are generally limited. However, <br />a series of sidewalks and mixed -use trails traverse the existing residential neighborhood southwest <br />of the proposed development (i.e., Century Farm North). <br />ALLIANT 9'.. <br />Alliant No. 221-0180.1 3 <br />June 30, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.