My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-08-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-08-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 8:43:38 AM
Creation date
8/9/2022 7:39:31 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/08/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Watermark 5" Addition <br />Development Agreement <br />August 8, 2022 <br />revised plan is submitted and approved in writing by the City and all <br />other regulatory agencies. <br />The street right-of-way, storm water storage ponds, and surface water <br />drainage ways shall be graded prior to commencement of utility <br />construction. Four inches of topsoil and a City approved seed mix shall be <br />installed within disturbed areas, and seed mix information shall be <br />provided to the City. <br />iii. The Developer shall be responsible for ascertaining that site geotechnical <br />and groundwater conditions are adequate and conforming with the <br />grading and site improvement as proposed. The Developer shall provide <br />testing from an approved testing company. <br />iv. The Developer's engineer shall certify in writing, with an as -built survey, <br />that all grading complies with the approved grading plan prior to issuance <br />of any building permits. <br />v. The Developer shall promptly clear dirt and debris within public rights -of - <br />way and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, until all home construction is completed, unless otherwise <br />released by the City. Warning signs shall be placed when hazards <br />develop in streets to prevent the public from traveling on them, including <br />detour signs if necessary. If and when the streets become impassable, <br />such streets shall be barricaded and closed. The Developer shall maintain <br />a smooth, hard driving surface and adequate drainage on all temporary <br />streets. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base and wear course, street signs and striping shall be furnished <br />and installed. <br />d. Sidewalks, trails and street lighting shall be installed within 6 months of the <br />bituminous base course. Extensions may be approved by the City Engineer, due <br />to weather conditions, upon receipt of a written request in writing by the <br />Developer to the City. In no case shall such extension extend beyond one year <br />from the date of installation of bituminous base course. <br />e. Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.