My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-08-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-08-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 8:43:38 AM
Creation date
8/9/2022 7:39:31 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/08/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER TOWER NO. 2 REHABILITATION August 2, 2022 <br />OWNER PROJECT NO.: NIA <br />WSB PROJECT NO,: 019414.000 <br />OWNER: CONTRACTOR: <br />City of Lino Lakes Classic Protective Coatings, Inc. <br />600 Town Center Parkway N7670 State Road 25 <br />Lino Lakes, MN 55014 Menomonie WI, 64751 <br />YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: <br />1, Provide a credit of $133,400 to the contract amount to sweep blast the interior dry surfaces in non -sweating areas and topcoat existing primer in <br />lieu of providing a complete blast and repaint of these areas. <br />2, Repair and replace all broken PVC electrical conduits as needed and replace upper tank section conduits with galvanized conduit for an add of <br />$14,590 to the contract amount, <br />3. Replace the existing service door and frame with a new steel custom-made service door and frame and reuse existing locks and electronic latch for <br />an add of $9,120 to the contract amount, <br />4. Install a DIP blind Flange on the removed bulk water sales line for an add of $1,050 to the contract amount. <br />IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM <br />ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE, <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: <br />ORIGINAL SUBSTANTIAL AND FINAL COMPLETION 8-15-2022 and <br />ORIGINAL CONTRACT PRICE: $1,188,857.60 CONTRACT TIMES: 9-12-2022 <br />PREVIOUS CHANGE ORDERS or SUPPLEMENTAL AGREEMENTS $0,00 <br />CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $1,188,857.80 <br />NET INCREASEIDECREASE OF THIS CHANGE ORDER:-$1081640.00 <br />ONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: <br />C <br />APPROVED BY: <br />$1,060,217,80 <br />PREVIOUS CHANGE ORDERS: 21 Days <br />9-5-2022 and <br />CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 10-3-2022 <br />NET <br />ADJ <br />INCREASE/DECREASE OF CHANGE ORDER: 0 Days <br />LISTED SUBSTANTIAL AND FINAL COMPLETION 9-5-2022 and <br />CONTRH A ACT ES WITGE ORDER: 10-3-2022 <br />WSB CLASSIC PROTECTIVE COATINGS <br />ENGINEER CONTRACTOR <br />CITY ENGINEER <br />DATE <br />CI OF L O ES <br />C:IUserslgjohnsonNluslc Wrojec(sLLlno LakeslWalor Tower No. Y RehahilrlalionlConsbucfionlChange Ordorslchange Order No, 2119g14999 Lrna Lakes Water Tcwer No. 2 RehahlIllation -Change Order No. <br />2C0 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.