My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The fill stockpiles are proposed with 4:1 side slopes on all sides, reducing the risk of <br />sliding or caving banks. Areas not being worked shall be established with turf within <br />seven (7) days of placement to avoid sliding. <br />(c) Properly drain, fill, or level off any pit or excavation so as to make the same safe <br />and healthful as the permitting authority may determine. <br />The proposed earth moving and filling site is designed to drain in a similar manner as the <br />existing conditions. The majority of the site will drain towards the existing wetlands and <br />a small portion will drain towards 2P Avenue S. Erosion control is proposed and will be <br />needed to ensure that sediment is prevented from entering the wetland and storm sewer <br />systems. <br />(d) Limit the depth of such excavation to an elevation no lower than the minimum <br />floor elevation for building construction as established by the City Engineer, so as not to <br />diminish development potential of the parcel. <br />Not applicable to this project. <br />(e) Limit any fill material to clean fill, defined as rock, sand, gravel, clay, or other <br />like and similar non -decomposable material. Concrete, asphalt, metal, wood, and other <br />debris shall be prohibited. <br />The project is only proposing moving and stockpiling "suitable fill material ". The site <br />will be limited to this type of material. The City will reserve the right to test the material. <br />(f) Require that all decomposable material, or other unsuitable foundation material, <br />be removed from an area before deposition of fill begins. <br />Not applicable to this project. <br />(g) Prepare a site plan showing existing and proposed grade elevations and effect of <br />storm water drainage on adjacent areas. <br />A site plan showing the existing and proposed grade elevations for the proposed earth <br />moving filling was provided. <br />(h) Specify a time when the excavation or land reclamation project shall be <br />completed. <br />The proposed earth moving and filling operations, including turf establishment, shall be <br />completed within 18 months of approval of the Conditional Use Permit. <br />(i) Place a minimum of four (4) inches of top soil over the completed project and <br />establish appropriate ground cover within sixty (60) days of completion, or in a time <br />period consistent with the City's stormwater management and pollution prevention plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.