My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2022 City Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2022
>
Searchable Packets
>
08-22-2022 City Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 7:40:07 PM
Creation date
8/19/2022 4:22:01 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2022
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />Sanitary Sewer Trunk Unit Fee ($1,630/unit; 2.92 units/Acre) <br />Acres <br />$0 <br />2. <br />City Sewer Availability Fee ($1,525/SAC Unit) <br />$0 <br />3. <br />Water Trunk Unit Fee ($2,341/unit; 2.92 units/Acre) <br />$0 <br />4. <br />City Water Availability Fee ($1,473/SAC Unit) <br />$0 <br />5. <br />City Surface Water Management Fee ($11,073/Acre) <br />$0 <br />Total Estimated (Budget) Developer Fees <br />$0 <br />IV. RECORD DRAWINGS. <br />a. Upon project completion, Developer shall submit record drawings in <br />electronic format verifying the location of the stockpiles. The as -built survey <br />must include, but is not limited to, proposed and final contours with adequate <br />elevation shots to show conformance, property irons (to be exposed in field), <br />and the 100-Year High Water Level (HWL) of all ponds, lakes, and wetland <br />areas. The files shall be drawn in Anoka County NAD 83 Coordinate system <br />and provided in both AutoCAD Awg and Adobe .pdf file formats. The plans <br />shall include accurate locations, dimensions, elevations, grades, slopes and all <br />other pertinent information concerning the complete work. <br />b. No securities will be fully released until all record drawings have been <br />submitted and accepted by the City Engineer. <br />V. COMPLETION DATE. <br />If the activities authorized by site plan approval are not initiated within twelve (12) <br />months from the final execution of this agreement, then Developer will need to start <br />the site plan approval process from the beginning. The Developer shall complete all <br />On Site Work as described in Section II A within 18 months of approval of the <br />Conditional Use Permit and the Site Performance Agreement. <br />The Developer may request a reasonable extension of time from the City and will <br />have to apply for renewal of the Conditional Use Permit. Renewal must be approved <br />by the City Council. If the extension is granted, it shall be conditioned upon <br />updating the security posted by the Developer to reflect cost increases and the <br />extended completion date. <br />VI. GUARANTEE. <br />A. The Developer will fully and faithfully comply with all terms and <br />conditions of any and all contracts entered into by the Developer. <br />Concurrently with the execution hereof by the Developer, the Developer <br />will furnish to, and at all times thereafter maintain with the City, a cash <br />deposit, certified check, or Irrevocable Letter of Credit, based on thirty- <br />Rehbein Site Development Preparation Performance Agreement page 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.