Laserfiche WebLink
j <br /> C IT 1( O F Environmental Memo <br /> [LNULAKES <br /> To: Diane Hankee, Kelsey Gelhar <br /> From: Andy Nelson <br /> Date: August 1st, 2022 <br /> Re: Environmental Comments/Rehbein Site Development Prep <br /> Environmental had the following comments on 8/01/22. <br /> 1. A trained individual with current certification in erosion and sediment control <br /> must perform inspections at a minimum every 7 days and within 24 hours <br /> after a rainfall event greater than '/2 inch in 24 hours. Inspection records must <br /> be retained with the SWPPP and include information detailed in 11.11 of the <br /> Construction Stormwater General Permit. Contact information for the <br /> inspector must be provided to the city prior to any soil disturbance on the site. <br /> 2. Stabilization method must be specified, including a seed mix (ex: Mn DOT <br /> seed mix XX-XXX) and a method for stabilizing the steep slopes of the <br /> stockpile. <br /> 3. Erosion blanket must be a natural net variety. This must be specified on the <br /> details sheet. <br /> •Page 1 <br />