Laserfiche WebLink
Biological filtration is commonly practiced in the United The ability for the plant to operate in parallel(one <br /> States and Europe and is endorsed by the Minnesota half of the facility under repair or maintenance while <br /> Department of Health(MDH)as an efficient and effective the other half maintains operation):The plant should <br /> method for treating these(and other)contaminants. be designed with individual filter cells that can be <br /> The cities of Minneapolis,St. Paul,and St.Cloud are removed from service and a split clearwell tank(wall <br /> now utilizing biological filtration at their water treatment down the middle)and high service pumps to meet this <br /> plants.The benefits of biological filtration include higher requirement. <br /> filtration rates, longer filter runs(reduces backwash <br /> Architectural features in the facility design:Office <br /> supply and wastewater volumes),savings in chemical <br /> space/control room,access for chemical delivery, <br /> costs,and reduction in disinfection byproducts.The <br /> parking for staff and visitors, laboratory facilities, <br /> design of a conventional gravity filtration process <br /> landscaping around the site,storage room(for <br /> with detention and aeration can easily accommodate <br /> meters, meter parts,compressor parts,water sample <br /> biological filtration. <br /> supplies, and water plant parts),and a garage for city <br /> maintenance vehicles and/or other large pieces of <br /> OTHER DESIGN CONSIDERATIONS WILL equipment. <br /> INCLUDE THE FOLLOWING: <br /> New 24-inch and 20-inch diameter raw watermains <br /> Design for the proper size of clearwell to store treated will be constructed on Birch Street to convey raw <br /> water and backwash tanks including provisions water from Wells 1,3,5,and 6 to the new water <br /> for water overflow and discharge from backwash treatment plant site: New transmission mains will also <br /> tanks:The proposed water treatment facility site will be constructed to pump the treated water from a new <br /> require an efficient footprint to save space and reduce finished water clearwell into the city's water distribution <br /> unnecessary costs. system.To properly size the high service pumps, WSB <br /> If requested by the city,we will study an innovative will use the city's existing water distribution system <br /> design for this site that could significantly reduce the model to model the expected discharge pressures in <br /> building footprint.The plant could be designed with a the distribution system with the pumps operating at <br /> clearwell that is located directly below the gravity filters minimum to maximum capacity. <br /> which would significantly reduce the footprint of the <br /> facility and the cost of the plant structure. <br /> Funding <br /> Obtaining funding for this large infrastructure project will be one of the most important work tasks for this project.WSB <br /> has evaluated and applied for funding from various funding sources such as federal earmarks,the bonding bill, and the <br /> PFA Drinking Water Revolving Fund(DWRF).Our team has extensive experience in preparing and submitting bonding <br /> bill and federal earmarks applications for proposed water treatment facilities.WSB has experience administering PFA <br /> funded projects through the Drinking Water Revolving Fund Program from previous water treatment facility projects. <br /> A Proposal for Design,Bidding,and Construction Administration for a <br /> Water Treatment Plant for City of Lino Lakes Project Understanding&Approach 13 <br />